Laserfiche WebLink
PUBL/C Ly0?KS <br />� ENG/NEER/NG / pUBUC &FRV/CES DEpqqTMENT <br />'4� Canswction Services <br />P�n• Box 2905 <br />Mt. Vemon, WA 98273 <br />Subject: Projecr. <br />lob qU�ress: <br />Plan Check No: <br />Dear Mr. Rommel: <br />Hanson <br />3312 Hoy� q�,enue <br />C0306-008 <br />Icverett <br />� <br />�li►' <br />2�02 <br />In response to your app��cation for a construction <br />that the issuance of a perrnit is being withheld forh�,�sons l�tedsbelowb T�; 5e o�ned and you are advised <br />issues only. Additional revisions or addi;ions may be required b <br />or Fire). q�� references refer to the i947 Unifom: �ents address building <br />�nd/or Washington State Ener B���din Y other depattments (such as Utilities, ylanning <br />gy Code 2001 Edition, unless st� d o�therwl5e ended by the State of W�h��g�on <br />In order for ttic processin of <br />Div�sion with two complete new sets of drawin n to continue, it wi1► be necessar <br />gs reflecting the correc6ons reque ted.provede the Building <br />�• Revised �� d <br />2. <br />3. <br />4. <br />5. <br />p ns o not show sufficien, space for stairs to be conswcted per the stair detail on Sheet R. <br />Revise plans to comply ��]� �eq��rements shown, <br />2 x S floor joists at <br />foundation plan. <br />�� °•c• wi11 not span l:i'6��, provide footing under all bearing w���s, show on <br />Minimum room dimensions are measured at the floor (R-21 insulation requires minimum 5%x" framing <br />cavity). Below grade walls ;ue required to be insulzied. <br />IrPm #6 frarn the pervious letter asks for a lst f]oor framing <br />understanding thac the lst floor, Floor joists have been modified. <br />been modified. <br />plan (not Ist tloor plan). It is mY <br />Please clarify if the floor syste;� has <br />Provide dimensions on all new p�i��ons. If laundry closet is framed such Psmt hallway is less thsn 3'- <br />0" clear, Gaming would be required to be changed. (Bedroom rru��m�m dimensian 7'-0" <br />the tloor.) <br />measared at <br />Please prepare a response letter showing where each item in this coirection letter is addressed on the pfan set. <br />Upor, resubmittal of the drawings, your application will be g��en priority and plan review will recommer.ce. <br />All required submitta�s shall be of sufficient detail and con;ain sufficient infortnation to ensure that the p�oPos�d <br />structure wiil be constructed in compliance with ��� adopted codes. <br />Sincerely, <br />� ��� <br />leff Heilman <br />Develop�nent Technician <br />CITY OF EVERETT • 32p0 Cedar Street • Everett, <br />DFDVI'1 YCF;.\ISTiU�IGLV A.4�Cp)M �U9 �i3 L' IIOIT AYf:b I <br />WA 98207 •�425) 257�gz�� , Fax (425) 257-8856 <br />