My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3402 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
3402
>
3402 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 5:32:50 PM
Creation date
2/18/2017 5:52:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3402
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />TO � Bob Landles - Plann' g pept. <br />FROM Public Works Dept. �.I � �1�, <br />n�r� May 21� 1979 ` <br />sue,ccr S.C•.P.A. ChecSclist Review 1/100 <br />PROPOSAL <br />��C�C����'1 � !�� <br />��iAY � z 1�; i � <br />��T CIIEY pOFE EVLitLi������� <br />rier.ni�:� �::;�[. <br />To construct an eight unit ;wo story apartment building at 3402 Hoyt Avenue. <br />RECOMMEN_ pqTip�s <br />It is the reco�nmenda?_on of the Public Works Dept. that issuance of a Negative <br />Declaratior. be subject to the following� <br />� 1. <br />�-- 2. <br />v 3. <br />Access, circulation and parking p��ins are to be submitted for Public Works <br />review and approval. Plans shall include all abutting public right of way. <br />City streets are to be ke�t clear of dirt and debris during construction. <br />During construction all truck traffic to and from the site within the City <br />of Everett shall be on arterial streets unless otherwise approved by the <br />Public Works Dept. <br />� 4. Standard street improvements including new curb, gutter, sidewalk, raised <br />inlet and wheelchair ramp on Hoyt, and curb installation on 34th Street <br />are required. Standard alley improvement is required. <br />� 5. <br />� 6. <br />Approval of a plan for erosion control during and after construction is required <br />prior to commencing site preparation. <br />On site detention is required. <br />AMEND CHECKLIST AS FOLLOWS: <br />II-13 b, c, c;, and f- change to yes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.