Laserfiche WebLink
INFORMATION FOR DEVELOPER <br />1. Detailed drawings in accordance with City design and construction <br />standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the <br />public right -of -tray. Public Works Department approval of these <br />drawings s required prior to any permits being issued. All <br />improvements shall be completed, approved, and warranted before the <br />Occupancy Permit is issued. <br />2. City streets and alleys are to be kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as directed by the Public Works Inspector. <br />3. Performance guarantees are required for alley paving and sidewalk <br />construction (including landscaping). <br />4. A one year guarantee is required on the public improvements (and site <br />landscapi^g, if applicable) for an amount not less than 10% of the cost <br />of construction and shall run for one year from the date of fina3. <br />issuance of the first Occupancy Permit for the project. <br />5. Destination of any fill taken off site will require a permit. <br />