My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 E INTERCITY AVE 2016-01-01 MF Import
>
Address Records
>
E INTERCITY AVE
>
4
>
4 E INTERCITY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 8:28:12 AM
Creation date
2/19/2017 8:27:47 AM
Metadata
Fields
Template:
Address Document
Street Name
E INTERCITY AVE
Street Number
4
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagc 1 of? <br /> Cliff Lindman <br /> From: Cliff Lindman <br /> Sent: Friday, January 13, 2006 920 AM <br /> To: Kirk Brooks <br /> Cc: 'mm.hirea@verizon.neY <br /> Subject: RE: drainage on new property <br /> Kirk -I visited the sile yesterday the 12th. and found no drainage probiems at this time. In 'alking wilh Mike <br /> Hireata owner of Blue Ridge Construction I am confident that an amiable resolution can be had. Mike is intending <br /> to slope his yard to the west lhus preventing any runoff to be directed to the Purdy propF rty. Furthermore yard <br /> drains could be installed along the easterly side ot the new home to catch any surfare flows. A short two to three <br /> foot wall constructed of decorative block is intended to extend from the end of the existing retaining wall southerly <br /> and westerly. I do not feel a cast concrete wall is necessary as proposed by Mr. Purdy. Blue Ridge construction is <br /> most cooperative and willing to work with the city to prevent any adverse drainac,e probiems created from the <br /> construction of this new home. At this time the site is super saturated v�ith rain and no site work is taking place. A <br /> pre sale of one of the new homes unde�construction is scheduled for February and Rb�� ridge construction <br /> intends to have some of this grading taken care of by then.Should you like to visit the site feel free to give me a <br /> call - Cliff -----Original Message----- <br /> From: Kirk Brooks <br /> Sent: Tuesday, ]anuary 10, 2006 5:30 PM <br /> To: 'WILLIAM PURDY' <br /> Cc: Larry Crawford; Cliff Lindman <br /> Subject: RE: drainage on new property <br /> Mr Purdy, <br /> Thank you for your email. Cliff and I will re��iew the problem on location and get back with you shortly. <br /> Likely wdhin the next day or so. <br /> Kirk <br /> From: WILLIAM PURDY [mailto:abcwaterspecialtyinc@verizon.net] <br /> Sent: Tuesday, January 10, 2006 3:57 PM <br /> To: Kirk Brooks <br /> Subject: drainage on new property <br /> Kirk Brooks <br /> Developments and Permits Building Official <br /> cc: Larry Crawford <br /> I Chief Administretive Assistant <br /> Our property is located at 12 East Intercity Ave. in Everett. <br /> We are ver�r concerned about the drainage changes caused by construction on the 4 Iot <br /> development on thr: West side of our property. <br /> The back yards and side yards of these lots have been raised approximately 2 feet <br /> above the original grade of the property. <br /> I do not believe the raised grade of the back yards of these lots was included in the <br /> I/18200G <br />
The URL can be used to link to this page
Your browser does not support the video tag.