Laserfiche WebLink
Page 2 of 3 <br /> original lot development plans and thus this increased grade would not have been taken <br /> into account in the plannin5 stages for this development with requardd drainage. <br /> This raised grade on the new development slopes toward our property. <br /> This is causing an increa�•ed amount of rain water to run off the new development and <br /> onfo our property. <br /> We talked with Mike at Blue Ridge Construction (the contractor building the house on the <br /> new development) and he said he was going to put a rock ,etaininci wall on the property <br /> line common to our property. If he does this it will stop earth from flowing on to our <br /> property. However the rock retaining wall will not stop water drainage on to our property. <br /> We request that the city t%.ke step� tu ensure that the lot development does not cause <br /> increased drainage in to our back and side yards. <br /> We would suggest a solid concrete retaining wall be built between our two properties that <br /> would stop water from flowing onto our property. This retaining wall would ha�ie a <br /> drainage system that would catch the water flowing toward our property and then take it <br /> to the existing storm drain system that has been installed in this development. <br /> Please advise of your intended actiori by iNonday January 16. <br /> �nclosed are pictures of the four lot development on the West of our property (12 East <br /> Intercity Avenue, Everett) that show the raised grade. <br /> William & Christine Purdy <br /> 12 East Intercity Avenue <br /> Everett, WA 98208 <br /> 425-355-982G ce�l <br /> 425-347-9389 <br /> u ' -� <br /> io o ja <br /> ,J � I, � � 0 ,� 0 <br /> J , � � i � ! i-x - --i ❑ -- <br /> x <br /> I <br /> , ' � I <br /> v�si�ou�� <br />