Laserfiche WebLink
Rinkcr Dtatcrials' <br /> Iuly 23,2003 <br /> Pagc 2 <br /> EARTHWORIC OBSERVATIONS <br /> Ini;ial grading along the south cnd of Lots H,I and J began in the summer oC i 999 lo Suild up <br /> the norih slopc in ordcr tc co�struct the FSA dctcntion pond. The foolprint oi the north slope <br /> (2H:1V) that resultcd from conswcti. ;the FSA detention pond exfended onto Lots H, I, and ]. <br /> Iiowever, the vast majority of the fill placcd on the sitc was placcd dur.ng two mass grading <br /> phascs in the summer of::000 and the spring t}vough fall of 2001. Grading in the sw.vn�T of <br /> 2000 through the }all oC 2G01 primarily involved wtting on the adjacent Seaway Lot 8 uroperty <br /> and using thc cut soil as fill on Lo��H t}uough L. <br /> During thc 1999 gradir.g season,we visitcd Uie PSA sitc on an intermittent to partdime basis <br /> on IOG occasions betwecn May 25 and OctoScr 18, 1999 to oUserve carthwork which includ�d <br /> cutting and filling along U�e south side of Lots [1, I, and J. Fill was placed mainly along the <br /> southcm portion of the site to consWct the FSA detention pond. The north slope of the <br /> PSA dcicntion pond was about 50 fcet high and consWcted at 2H:1 V using soil cut from the FSA <br /> pruperly. Rcsults of our construction moniroring serviccs are prescntcd in our daily ficld reports <br /> for thc 1999 projcct. Nos. 1 througli 10G. Copies of thesc reporls were givcn to Rinker Materials <br /> nnd Scarsclla,thc carthmoving contractor,during consWctian. <br /> During the 2000 �eading scason, we visilcd the site on an intermiltent to part-timc basis on <br /> 51 occasions betwcen lune 28 and Scptcmbcr I5, 2000 to observe carthwork, which includcd <br /> culting and flling along the souQi portion of Ihe sitc. Pill was placed mainly wiU�in Lot I, the <br /> west sidc oCLot II and the east side of Lot J. Pill was gcnereted from soil wt from the adjacent <br /> Seaway Lot 8 property and from the north cnd oC the site. Rcsults of our construction monitoring <br /> scrviccs arc prescntcd in our daily f cld reparts tor�}ic 2000 projcct,Nos. 1 through 51. Cepies of <br /> Ihcsc rcports wcrc givcn to Rinkcr Matcrials and KLB, lhc carthmoving contractor, during <br /> consWclion. <br /> During the 2001 grading scason, we visitcd Ihe site on a part-time basis on i l l occasions <br /> betwcen March 23 and Octobcr 12, 2001 lo observe earthwork which included llaltening of <br /> highwalls and filling at the site. Pill was placed at the site using Ihe soil cut from tlic adjaccnt <br /> Scawsy Lot 8 property. Rcsulls of our construction monitoring services arc presented in our daily <br /> ficld reporls for thc projcct, Nos. 1 tivough ]l l. Copics of these repods were given to Rinker <br /> Mnterials and KL[3 during consWclion. <br /> Our earlhwork obscrvation scrviccs includcd thc following activitics at thc sitc: <br /> • Preparing pit tloor arcas <br /> • Plattcning of intcrior highwalls <br /> • Benching new Cdls into native cut slopes and previously placcd fill slopes <br /> • Structural fill placcmcnt :.:d compac(ion <br /> • Rcmoval of temporaiy r:�mns <br /> • SctUcnunt monitoring. <br /> PREPARING PIT FLOOR AREAS <br /> Iixposcd surfaccs resulling Gom thc mining activitics ur pasl �rading activitics wcrc <br /> cvaluatcd by a rcprescnlative from GcoL'nginccrs prior to pLicing fill. Thc contractor rcmovcd <br /> G eoCn gin e crs PilcNo. L192-00J-0}.� <br /> C � <br />