Laserfiche WebLink
���': <br /> 11. A hvo-year guarantee is required for private retention/delention or other drainage <br /> trcatmenUabatcment facilities serving arcas larger than one acre. <br /> 12. On-site watermain will be staked withi.i an easement to the City. 7'he easement will bc <br /> submitted to the City prior to issuance of pemiits. <br /> 13. As-builts of stor.n sewcr, sanitary sewer, and watcr svstems will be required to be submitted per <br /> City Design and Construction Standards and Specifications for Development. <br /> 14. Per the 1992 Electric Transmission Line Easement and Relocation Agreement behveen the PUD, <br /> Ciry of Everett, Washingtott Services Inc, and Associated Sand And Gravel, Ina (now Rinker <br /> Materials), a notc must be placed on the facc of the binding site plan stating that a 30-fout <br /> easement for a 115 kV transmission line must be provided along the souUi side of Lot 8 snd a 15- <br /> foot easement must be provided along that portion of lhe east sidc of Lot 8 of Seaway Center to <br /> lhc new east-west roadway through Lot 8, together with any anchor casements necessary to <br /> support the transmission line poles. This easement may be extinguished if an altemate <br /> transmission line route consistent with the intent of the Agreement and acceptable to thc <br /> signatories is securcd. <br /> 15. Puge! Sound Energy is the natural gas provider in this area. To initiate new service orders, <br /> please contact Puget Sound Energ,y at 1-8S8-CALL PSE (225-5773) at Ieast ihree months prior to <br /> the required in-service dale. <br /> If the inGastruclure improvements (grudin�of existing roads, new storm sewer;ines, etc.) <br /> required by this development cause the relocation of existing gas facilities, it will be at the <br /> developer's sole expense, and require 90 days minimum notice. Please contact PSE Records at <br /> (206) 521-5277 Ccr inforniation on the location of existing facilities in the area. Please contact <br /> Mariamne Kingsbury at (425) 356-75ll to coordinate relocation requests. <br /> 1G. The Snohomish County PUD presently has suC�cient electric system capacity to serve the <br /> proposed development. However, the existing District facilities in the local area may require <br /> upgrading. <br /> Cost of any work, new or upgrade, to existing facilities tiiat is required to connect this proposed <br /> development to thc District clectric system shall be in accordancc with the applicable District <br /> policies. Anchor casements �vill be needed to accommodatc this change. ]t will be necded ;,t the <br /> southwest and southeast comers of Lot 8F. <br /> For further inCormation about the electrical service requirements for this project, plcase call the <br /> District's Everett OCfice at 42�-258-8272 to contact a Customer Engineer. <br /> APPEALS TO HEARING EXAMINER FOR BINDING SITE PLANS: All appeals of decisions relating <br /> to binding site plans shall be made to the Hearing Examinec Such appeals must be made in writing and <br /> Gled with the office oCthe Hearing Examiner within fourteen (14) calendar days from Uie date on�vhich <br /> the prcliminary decision was rendered. The written appcal shall includc a detailed explanation stating <br /> the reason for the appeal. All appeals shall be on fo�ms provided by the Planning and Community <br /> Devclopment DepartmenL Appeals of the Hearing Gxaminer's decision shall be to Snohomish Counry <br /> Superior Court and filed within 21 calendar days of issuance of the decision. <br /> s�` <br />