My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.6 PUBLIC �VATER SUPPLIES <br /> 8.G1 Threshold <br /> The analysis in the IVate�S;:s(em Plaii projectcd the overall futurr,peak-hour demar;d for the area at 2.7 <br /> gpm/acre (approximately 4,000 gpa/day peak flo�v), and assumed fire Ilow requirements of approximatcly <br /> 3,500 gpm for commercial and industrial/nianufacturing uses. Based upon the proposed design of the <br /> water system, any devclopment using more than 2.7 gpmJacre has the potential to affect�vater pressare on <br /> other sites. Additional analysis will be requireJ for development proposals with a peak hour demand <br /> aUove 2.7 gpmJacre and/or a fire (low requirement of 3,500 ��m or grcater. The additional analysis may <br /> be as simple as calculations completed by the Public Works Depa;tment prior to a pre-application mceting <br /> on a specific development proposal. The additional analysis must Jetermine how the proposal's water <br /> demand will affect the enlire water supply and distribution system. F'rojects with no additional major <br /> improvements needed and no adverse cumulativc impacts on thc water supply and distribution system arc <br /> covered by Ihis analysis. <br /> An analysis was conducted on the proposed water system. [t was detcnnined diat a fire (low of 5,000 <br /> gallons per minute could be achieved by the existin3 and proposed system. <br /> The 2.7 gpm/acre is an overatl average peak hour demand assumed for plamiing in large arcas such as the <br /> stady area. However, q�ere will undoubtedly be site-speci6c proposals�vith larger demand. Por example, <br /> large irrigation systems can exceed 50-gpn�/acre demand. Other land uscs wiU�demands much lower than <br /> 2.7 gpm/acre, such as warehouses, are assumed to occur to offset the higher demand land uses, resulting in <br /> an overall area wide average of 2.7 gpm/acre. <br /> 8.6.3 Mitigation Mcasures <br /> I. Looped water mains may be reqtiired for somc sites to mect fire Flow requirements and to protect <br /> water quality. Pressurc reducing valves may bz required when looped systems are constructed. <br /> (SEPA Public Services and Utilities Policies) <br /> 2. Developments must construct improvements necessary to provide a wate.r pressure of 40-80 psi under <br /> normal operating conditions as required by Public Works. (SEPA Yublic Sc.rvices and LJtilities <br /> Policies) <br /> 3. Recycling of runoff water Gom bus or truck washing facilities is rcquired. (S�PA Public Services and <br /> Utilities Policies) <br /> -1. New watcr system facilities must avoiu environmentally sensitive areas to die maximum extent <br /> possible. Where water lines must be constructed through environmentally sensitive areas,besi <br /> management practices must Ue followed. (Sec the mitigation measures discussed in Section 4) <br /> (SEPA Earih, Watcr, nnd Plant and Animal Policies) <br /> i 3�z3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.