My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �. <br /> 6.1 ELECTRIC ENERGY <br /> 6.1.1 Threshold <br /> The PUD No. 1 forecasts an adequate supp]y of electricity for the SW Everett Subarea. Specia] Property <br /> Use permits are required for aboveground utiliry facilities. These reviews will address landscaping and <br /> screening, view and compatibility issues. <br /> 6.1.3 Mitigation Measures <br /> 1. All power lines carrying a voltage of less than 15 kV must be undererounded. (SEPA Land and <br /> Shoreline Use Policies) <br /> 2. When maintaining corridors for aboveground lines near environmentally sensitive areas, to the ex[ent <br /> feasible, the PUD shall leave cut tree stumps as snags for wildlife. The corridors must be replanted <br /> with native species that will nut grow high enough to impact the lines. (SEPA Plant and Animal <br /> Policies) <br /> Section 7: ENVIRON114ENTAL I-IGALTH <br /> 7.1 NOIS� <br /> 7.1.1 Threshold <br /> All deve]opment in Everett must be in conformance with the requirements of EMC 20.08, tiie Noise <br /> Contro] Ordinance. Noise studies may be required ro detennine if a proposal is in conformance with the <br /> ordinance. <br /> 7.1.3 Nlitigation Measures <br /> None <br /> 7? TOXIC/HAZARDOUS i�1AT�RIALS AND EXPLOSIV�S <br /> 7.2.3 Nlitigation Nieasares <br /> Construction Phase <br /> 1. Construction equipment and vehicles must be maintained so they do not leah fuels or lubnccnts. <br /> During conswction, a staeing :uea must be specified for all vehicle maintenance activities. The <br /> sta�ing area must be located well away from al] drainaee courses. �Vhere possible, all storm���atei <br /> from related main[enance areas must be directed to the sanitary sec��er, rather than the stormwater <br /> system. (SEPA Earth, `Vater and L-nviror.mental Health Po]icies) <br /> 2. During constructi�n activities, all spills of tuel and hazardous materials must be contained and <br /> removed in such a manner as to pre��ent their entering the waters and soils of the Smte. Cleanup of <br /> spills must take precedence over other�vork on site. (SEP.4 Earth, R'ater and Environmental Health <br /> Policies) <br /> y� <br />
The URL can be used to link to this page
Your browser does not support the video tag.