Laserfiche WebLink
r t- <br /> 20 Outdoor srora_e and refuse disposal areas shall not exceed iive percent (5°'0) of the gross floor area of i <br /> all buildings on a lot without prior approval of the Planning Director. Outdoor storage areas shall be <br /> totally screened from public rights-of-way, surrounding properties, and parking areas. (SEPA Land <br /> and Shoreline Use and Aesthetics Policies and SEPA NIDNS No. 15-87) <br /> 21. Per the 1992 Electric Transmission Line Easement and Relocation Agreement between the PUD, City <br /> of Everett, Washington Services Inc, and Associated Sand And Gravel, Inc. (now Rinker Materials), a <br /> note must be placed on the face of the binding site plan stating that a 30-foot easement for a 115 kV <br /> transmission line must be provided along the south side of Lot 8 and a 15-foot easement must be i <br /> provided along that portion of the east side of Lot 8 of Seaway Center [o the new east-west roadway <br /> through Lot 8, together with any anchor easements necessary to support the transmission line poles. <br /> This easement may be extinguished if an altemate transmission line routc consistent with the intent of <br /> the Agreement and acceptable to the signatories is secured. (SEPA Public Services and Utilities � <br /> Policies) <br /> 22. An analysis was conducted on the proposed water system. It was deternuned [hat a fire flow of�,000 <br /> gallons per minute could be achie��ed by the existing and proposed systeir,. With the system ? <br /> improvements proposed and construction of the water system connection to the system proposed in the <br /> Rinker Materials site no additional SEYA conditions cn the water system are necessary. (SEPA Public I <br /> Services and Utilities Policies) <br /> I <br /> ADDITIONAL INF�RMATION FOR DEV�LOP�R: <br /> The following information is provided for the developer's benefit. These are not SEPA conditions but are i <br /> associated with other laws or requirements. All requirements are preliminary in nature, and are based i <br /> upon the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The ; <br /> proposal must comply with all ordinances in effect at the time a complete building permit <br /> application is filed,including those not specifically set forth leerein. (Exception: For vesting under <br /> the Zoning Code, please refer to Section 44 of the Zoning Code). Contact the Planning Department for <br /> information regarding appeals processes for the requirements listed ir this document. <br /> 1. A Public Works Pernut is required for this projec[. Detailed drawings in accordance wi[h City <br /> Design and Construction Standards shall be submitted to the Public Works Department, showing site <br /> parking layout, landscaping, utilities, storm drainage, temporary construction erosicn control, and all <br /> required improvements in the public right-of-way. Public Worhs Department approval of these <br /> drawings is required prior to any pernuts being issued. All improvements shall be completed, <br /> approved and warranted before approval is granted. <br /> 2. Parl:ing must be per City Zoning Code and Ciry Design and Construction Standards for <br /> Development. <br /> 3. This project must comply with the current City of Everett Buildin� Code and Sprinlder Ordinance. <br /> �7d I <br /> ic <br />