Laserfiche WebLink
t ,_ <br /> e <br /> � � <br /> 4. Special charges for connection to the sewer and water systems in accordance with Ordinance 1998-94 <br /> and subsequent revisions are applicable. These charges are based on projecced water usage and can <br /> be substantial. App��cant is encouraged to obtain a copy of the Ordinance and determine estimated <br /> charges prior to building peanit application. The actua] charges shall be computed by the Public <br /> Works Department per the ordinance in effect at the time and according to the information on the <br /> approved plans at the time of building permit issuance. <br /> 5. Lack of comment on the plans submitted with the application does not constimte approval of these i <br /> plans. <br /> 6. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every structure. I <br /> 7. City streets are to be kept clear of dirt anc debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. I <br /> � <br /> 8. A one-yeaz warranty is required on the public irnprovement for an amount not less than 10% of [he <br /> cost of cons[ruction and shall run for one year from the date of 5na1 approval/issuance of the first <br /> Occupancy Permit. <br /> 9. A two-year guarantee is required for private retention/detention or other drainage <br /> treatmendabatement facilities serving areas larger than one acre. <br /> 10. On-site water main will be staked within an easement to [he City. The easement will be submitted ro <br /> the City prior to issuance of pernut�. <br /> 11. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per City <br /> Design and Conswction Standards and Specifications for Development. <br /> 12. The street system for each phase must be constructed prior to the final approval of the Binding Site <br /> Plan for each phase of the development. <br /> 13. The proposed phasing of frontage improvements conceptually appears reasonable at this time. <br /> However, the City reserves the right to require any and/or all frontages to be improved based on <br /> fumre project development impacts. <br /> I�l. Utility mains must be constnicted prior to the final approvsl of each Binding Site Plan map fur each <br /> phase of the development. <br /> I5. Screet naming for this Binding Site Plan sh��" be in accordance with the Everett Municipal Code, <br /> Section 13.41.100. The name may be any combination of letters forming 2 recognizable noun for <br /> which should not duplicate the names of any presendy existing street in Snohomish Counry. <br /> 16. Maximum flows from this site shall not exceed the desion volumes of the Southwest Everett LTLID as <br /> stated in the Suuthwest Everett Sub Area Plan. <br /> 17. On-site detention of storm �vater runoff for is reyuired in accordance with current City standards. <br /> I�/ <br /> /d <br /> �4 <br />