My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10500 I-5 2016-01-01 MF Import
>
Address Records
>
I-5
>
10500
>
10500 I-5 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 10:55:00 AM
Creation date
2/19/2017 9:21:14 AM
Metadata
Fields
Template:
Address Document
Street Name
I-5
Street Number
10500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Do you know whether applicaTions are pending for governmental approvais of oiher <br /> proposals directly affecting ;he property covered by The proposal? If yes, expiain. <br /> No <br /> 10. List any government approvals or permits thaT will be needed for the proposal, if <br /> known. <br /> Building Permit - City of Everett <br /> I I. Give brief, corr�?IeTe description of tF�e project including (but not limited to) its <br /> size, general design elemenis, and other factors ihat will give an occurate <br /> undersianding of its scope und noture. There are several question> in ihis checklist <br /> that ask you to describe certain aspects of ihe proposal. You do noi need to repeat <br /> those answers on this pege. <br /> The First Stoge: Includes consfruction of a 1,540 ;quare foof restroorn building <br /> with 16 fixt�re units, a 143 square foot seaTi�g kiosk and a pedestrian plazo. <br /> The $econd Sta e: Includes expansion of oorking area (approximately 34 <br /> oddiTional stalis , resurfacing the existing lot and expansion of the R.V. Dump <br /> Station. <br /> The Third Siac�e: RehabilitaTion or repiacement of the existing resTroom <br /> bui Iding. <br /> 12. Location of the proposal. Give sufficient informaTion for a person to undersTand <br /> the precise location of ihe proposed proje^1, including a sireet oddrEss, if any, and <br /> section, township, and range, if known. If a proposol would occur over a range of <br /> orea, provide ihe range or ba�ndaries of The site(s). Provide a legal descripTion, <br /> site plan, vicinity map, and topographic map, if reasonably wailab�e. <br /> The project is locoted on scuthbound SR 5 from milepost 187.63 to 188.47 <br /> within EveretT CiTy Limits (Snohomish County). Section 19, Township 26 North, <br /> Ronge 5 East. <br /> B. ENVIRciiJMENTAL ELEMENTS <br /> I. Earth <br /> a. General description of the site: <br /> r- iar <br /> b. What is the steepest slope on the siTe �approximate percent slope)7 <br /> Qne percent. <br /> c. What genera! types of soils are found on ihe site (for example, clay, wnd, • <br /> grwel, peat, muck)? If you know ihe clossification of ogricultural soifs, specify <br /> them and note any prime farmland. <br /> Gravel and sand over soft siH ond sand. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.