My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10500 I-5 2016-01-01 MF Import
>
Address Records
>
I-5
>
10500
>
10500 I-5 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 10:55:00 AM
Creation date
2/19/2017 9:21:14 AM
Metadata
Fields
Template:
Address Document
Street Name
I-5
Street Number
10500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� f,,,� <br /> d. Are there surface indicotions or history of unstable soils in the immediate <br /> viciniTy? If so, describe. <br /> No <br /> e. Describe the purpose, fype, ond approximate quantilies of any filling or grading <br /> proposed. Indicate suurce of fill. <br /> Approximately o00 cubic yards of fill will be needed for ihe parking and <br /> R.V. dump area expansions. Minor excavation (less thon 100 cubic yards� <br /> will be needed for the new restroom buiiding and for an areo of parking lot <br /> expansion. <br /> f. Could erosion occur as a result of clearing, consiruction, or use? �f so, <br /> generally describe. <br /> Erosion could occur during consiructicr� on slightly sloped grovnd or near <br /> drainoge ditches. <br /> g. About whai percent of iFa site will be covered with impervious surfaces after <br /> project construction (for example, asphalt or buildings)? <br /> Approximately 30 perceni of ihe right-of-way area will be covered by <br /> impervious surfoce. A small increase over existing percentage. <br /> h. Proposed measures to reduce or control erosion, o.* other impacis to The earth, <br /> if any: <br /> The conTroctor will protect exposed soil in ihe cut and fill oreas wi!!-h <br /> standar:; erosion control measures including plastic cover and imme��iate <br /> reseeding of The soil. <br /> 2. Air <br /> a. What types of emissions to ihe air would resuH from ihe proposaf (for example: <br /> dust, outomobile, odors, industrial wood smoke) during consiruction and when <br /> the project is completed? If any, generally describe and give approximate <br /> quantities if known. <br /> Consiruction activiTies may cause short term impocis to air quolity in The <br /> immediate vicinity of the projecT. Heavy equipment being used moy cause o <br /> temporary increase in the emission of dust and hydrocorbon or odors. <br /> b. Are ihere any off-site sources of emissions or odor that may affect your <br /> proposol? If so, generally describe. <br /> None <br /> c. °roposed measures to reduce or control emissions or other impocTs to air, if <br /> ony: <br /> The coniroctor will be required to comply with local and state air pollution <br /> laws. <br /> _� <br />
The URL can be used to link to this page
Your browser does not support the video tag.