My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10500 I-5 2016-01-01 MF Import
>
Address Records
>
I-5
>
10500
>
10500 I-5 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 10:55:00 AM
Creation date
2/19/2017 9:21:14 AM
Metadata
Fields
Template:
Address Document
Street Name
I-5
Street Number
10500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Animals <br /> a. Birds ar,d animals which have been observed on or near the siTe or are known to <br /> be on or near ihe site: <br /> Birds: Fawk and Songbirds <br /> Mcmmals: Small Mommals and Rodents <br /> b. List any threoTened or endangered species known to be on or near the site. <br /> None <br /> c. Is t`�e site part of a migration route? If so, explain. <br /> No <br /> d. Proposed measures to preserve or enhance wildlife, if any: <br /> Maintoin The vegetative cover. <br /> 6. Enerqy and Naturol Resources <br /> a. What kinds of energy (electric, notural gas, oil, wood stove, solar) will be used <br /> to meeT ihe completed project's energy needs? Describe whether it will br used <br /> for heating, manufacturing, etc. <br /> Eleciric hookups will be needed for resiroom facilities for lighting and heot. <br /> b. Would ihe project affect the potential use of solar energy by adjacent <br /> properties'. If so, generoily describe. <br /> No <br /> c. What kinds of energy conservoTion features ❑re included in the plons of this <br /> proposal? Lisi other proposed measures to reduce o� control energy irt,?acis, if <br /> any: <br /> Not appiicable. <br /> 7. Environmental Health <br /> a. Are there any environmental health hazards, including exposure to taxic <br /> chemicols, risk of fire and explosion, spill, or hazardous wasie, ihat would occur <br /> os a result of this proposal? If so, describe: <br /> The risk of upset is always present during construction. The use of proven <br /> construction meihods and troffic control will minimize the occident risk. <br /> I) Describe special emergency services That rnight be required , <br /> 'Jone <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.