Laserfiche WebLink
ro A1 Theal „ <br /> FR�M Ron Cameron .• �,s TM � <br /> DATE �une 22, 1983 <br /> � •����{�K�f^ � <br /> � <br /> SUBJECT Comnunity Transit dCCe55 t0 Airport CITYOFEVERETT,EVERETTWASMINGTON � <br /> In several meetings with Community Transit, th?ir design consultant, Planning, and <br /> Boeing. . .the eontract was worked out to cover traffic access & safety problems and the <br /> neaded so?utions. <br /> F'irst, approval is only for Phase I and that level of Traffi.c Activity. Review an� <br /> other traffic control requirements will be made again for Phase IT or xNCY` other <br /> e>;pansion. <br /> Even thouoh this area is subject to substantial traffic variations, the analysis <br /> ccr�ducted by their consultant shows that there should 6e no problems for WORST <br /> case, highest volumes, conditions. <br /> ` IF 1'HERE SHOULD BE, then, item C on page 3(65 of the agenda)_ requires the ov+ner <br /> to use the southern access Y,o 100th St and the Airport Road signal . <br /> The analys�s shows no expected problems for Phase I and a required solution if there are, <br /> that' s the legal perspec� ;e. <br /> ` The pi�actical perspective for Phase I is <br /> the Airport Road traffic has tfie right of way, bus traff�c from thc: site has <br /> to yield. . .it is nut a condition where the bus traffi.c could control the flow. <br /> ;� if there were problems for rush hour huses and vehicles(in the 5:30 to 6:30 am peak) <br /> then, the delay costs or safety costs to tlie huses would immediately dictate <br /> that they finA an alternative route <br /> the immediate alternative route ��ould be turnSny r�gfit arul driving the <br /> loop of Sr526 and I-5 to go south instead of turning left across the <br /> northbound worker traffic. <br /> Either the legal or practical solution will mitigatz any Phase I traffic <br /> problems foreseen with the Community Transit analysis. . .the analysis based <br /> on City traffic counts, bus projections, etc. <br /> ;� <br /> �, <br />