Laserfiche WebLink
� o The aver-age daily flow rate from the maintenance building <br /> is assmied to be 20 gppd for each of the 34 maintenance <br /> � �ployees or .56 gpm. <br /> o Peak d:iily flows are 2.5 times average daily flows or 1.4 <br /> RFm• <br /> The total sewer hook-up fee for Phase I construction would therefore be <br /> $8,812 as shown belrn,: <br /> Adminis�rative Building 4,320 s.f. X .624/s.f. _ $2,696 <br /> Operations Building 5,780 s.f. X .624/s.f. = 3,ti07 � <br /> Maintenance Building $1,506 (1.4 gpm) + f716 (.56 gpm) = 2LSQg <br /> Jts,tsl� <br /> 4) The detentirm pond outlet should be sized for a 10 year pre- <br /> develoFment stoxm. Dan figures thi:s rate should be 1.24 cfs instead of <br /> 1.39 cfs as we computed it. We wi1:L check tius rate. Multiple orifices <br /> (3) should be used to release this •rate. (See City ef Everett detail <br /> 413). The primary orifice should release 50 percent of the flow with ttie <br /> upper two orifices releasing 25 percent each. The orifices should be <br /> spaced at 1/3 intervals: <br /> 5) The detentian pond and on-site storm drain lines should be sized for a <br /> 25 year storm. <br /> 6) Roof drainage from the maintenance building mwt be routed through the <br /> detention pond. Roof drain detention is also not allowed by the City of <br /> � :;verett. <br /> 7) Drai;iage from Sho Isle will be routed through our site a.r�d by-pass our <br /> detention pond. The pipe line should be sized to handle a 25 year storm <br /> from a fully developed site in the futise. Dan says the Kasch Park system <br /> is sized to handte b�th sites fully developed. <br /> 8) Detention pond inlet shall be at the sam.e elevation as 2he outlet <br /> pipe. <br /> 9) Tom Thetford is the City of Everett plan reviewer (259-8822) for water <br /> and sewer. Fois copies of the plans should be submitted to him for the <br /> building permit. <br /> , 10) Kasch Par� has submitted 99 percent review drawings to the City for <br /> their review. Kasch Park's phase I construction is scheduled for bid open <br /> on August lOth with construction slzted to begin immediately thereafter. <br /> Coordination between Kasch Park's project and ours is lacking. It was <br /> identified that the proposed berm between our two sites is in conflict <br /> with the location of the te�orary access road on Kasch Park's property. <br /> This issue, as once thought to be resolved, should have input fr� Jerry <br /> Ervine (City Plamiing Dept. Rep), Don Petitclerc (City Safety Div., <br /> 259-8847) and Bill Strong (City Safety Div., gune imtil S-8). KQd will <br /> check Kasch park's drawings for utility conflicts and relay any problems <br /> to Ruben Gonzales by 7-27-83. <br /> -2- <br />