My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD 2018-01-01 MF Import
>
Address Records
>
KASCH PARK RD
>
2300
>
2300 KASCH PARK RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 1:38:08 PM
Creation date
2/19/2017 10:37:32 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Notes
INCLUDES PLAN SET FOR B0803-013
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
798
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Traffic <br /> Figure 2 depicts the on-site coach parking for the nitimate Phese II plan <br /> of 250 bus capn�.ity. Huses wili ]eave the sitc beginning about 4:30 e.m. <br /> and 90:e of the fleet will be in service for the oorning and evening peak <br /> hours. A portion of the buses will return to the site at 9:(10 e,m. and <br /> leave ta l;o into service at 3:00 p.m. Tt�e fleet tt,en ictu:ns after the <br /> p.m. peek hour. Figure 3 depicts the Driver, Aclministrations and ifain- <br /> tenance Ftaff auto activ?ty at the site. <br /> 1'he drivers arrive bc:ore the morning peak traffic nnd leave after the <br /> �.m. peak. The edjacent Kasch Park as proposed will hsve, in the future, <br /> 5 basebell fields. Parking for approximately 300 autas• will be provided <br /> at the Park. Peak ac:ivity at the park will occur on summer evenings nnd <br /> weekends. <br /> Estimetes of the Projrct Site traffic fer the daily and the 3 to 4 p.m. <br /> �eak hour in 1990 when the project is fully complete is licted iu iabie 1. <br /> Projected 1950 Vehicle Trips Table 1 <br /> � � � <br /> � 100th Access Road � Park Access Ruad <br /> Acticity � Daily� PH Peakhr. � D=.ily � PM P.:nkhr. <br /> � � In Out � � In Out <br /> � � � �— <br /> � � � i <br /> C.T. Employee Autos snd Visitors � -- � -- -- � 880 � 60 10 <br /> � � � � <br /> C.i. Buses and De.livery Trucks � 330 � -- 40 � 360 � -- 40 <br /> � � � � <br /> Kssch Park Visitor's Autos � "' � " -' � Gb0 � 60 10 <br /> TOTALS 330 -- 40 1,900 140 60 <br /> As confirmation, lhese e;timntes �were compared to the M�tro South Operat- <br /> ing Hase Draft zIA. Field counts dated Septem:rer, 1981 Gith a 250-bus <br /> base and a 900-bcs major overhaul capacity shop produced 660 bus and OBO <br /> auto trips. The 4:00 to 5:00 p.m. peak hour had 330 veh�c.les, 100 inbound <br /> and 2?0 exiting. <br /> Impact of Projected Traffic <br /> The project will be constructed in phases es trr,nsit demand increnses. <br /> For purposes o: this analysis, the base is assumed to be in use b}• l00 <br /> buses in 1985 and 250 buses in 1990. The first phase plus the proposed <br /> park treffic would increase traffic on AirporC Road et the Cusino Rocd and <br /> -Z- <br />
The URL can be used to link to this page
Your browser does not support the video tag.