Laserfiche WebLink
I <br /> , � �' � 3 �� <br /> STAFF REPORT TO HEARING EXAM[NER <br /> SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPIviENT PERMIT <br /> CLARE BRIDGE SMA#2-98 <br /> DAT�: April 22, 1998 � <br /> � � � 3 � � � D � <br /> APPL[CANT: Mike Hickey I1 Q�� 4 ° 1998 � I <br /> Neil WalterCompany " '—�' <br /> 2102 North Pearl,Suite 302 <br /> Tacoma,WA 98401 ��y ,.__ <br /> REPRESENTATIVE: Dan Balmelli <br /> Barghausen Engineers <br /> 18215 -72nd Avenue South <br /> Kent, WA 980232 <br /> LOCATION: northeast comer of Lak�Heights Drive and 19th Ave.SFJSR 527 <br /> PAOPOSAL: The constnution of a 52 bed assisted living facility with a total of 30,750 sf <br /> of building area and 26 parking stalls on a 4 acre site. The proposal includes <br /> an application to allow an atrium portion of the building to extend above the <br /> 28 foot height limit to 33 feet. <br /> GENERAL PLAN. 43: Office <br /> ZONING: B-2(B), Office <br /> SHORELINE <br /> DESIGNATION: Urban (Snohomish County Shoreline Management Master Program) <br /> EXHIBITS: <br /> I. Staff Report <br /> 2. Vicinity Map/Current Zoning Map <br /> 3. Altemative Living Services Company History <br /> 4. Building Appurtenance Narrative Statement <br /> 5. Revised Mitigated DNS #29-93 <br /> 6. Master Program Exce�pts <br /> 7. SR 527 Shoreline Improvements <br /> 8. Citizen Comments <br /> 9. Site Plan,Grading Plan <br /> 10. Building Elevations and Floor Plans <br /> FINDINGS AND CONCLUSIONS <br /> I. Background <br /> The project site is Iocated across 19th Ave. SE from Silver Lake. At one point in time, the <br /> subject site and a parccl Fronting on Silvcr Lake were pan of a larger Bethany property that <br /> extended to the east end of L:ilce Heights Drive. Bcthany recendy deeded the parcel �ronting on <br /> Silver Lake to the Ciry of Everett and created the subject(Clare Bridge)property through a <br /> Boandary Line Adjustment. <br />