My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2131 LAKE HEIGHTS DR 2016-01-01 MF Import
>
Address Records
>
LAKE HEIGHTS DR
>
2131
>
2131 LAKE HEIGHTS DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 12:47:52 PM
Creation date
2/19/2017 12:46:59 PM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2131
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
il <br /> ' 1 SECTION 1-OS, PROSECUTION AND PROGRESS <br /> i 2 June 8, 1998 <br /> ' 3 1-08.1 Subcontracting <br /> I 4 The first paragraph is revised to read: <br /> J <br /> � 6 Work done by the Contractur's own organization shall account for at least 30 <br /> 7 percent of the awarded contract price. Befere computing th�s percentage, <br /> I 8 however, the Contractor may subtract (from the awarded contract price) the <br /> 9 costs of any subcontracted wo�ic on items the contract designates as soecialty <br /> 10 items. <br /> 11 <br /> � ;2 1-08.5 Time for Complets��n <br /> 13 l fie first senience of the fiRt;paragraph i:, revised to read: <br /> � 14 <br /> 15 Each working da�,� �hall be chsrged tc� the contract as it occurs, until the contract <br /> 16 work is physical!y comp�ete. If sub,tantial comoletion has been granted and all <br /> � 17 the authorized working days ns.��a been used, charging of workiny days will <br /> 18 cease. <br /> 19 <br /> I 20 1-08.8 Ext��nsions mf Time <br /> 21 The follow;ng paragraph is inserted after the second paragraph: <br /> 22 <br /> I 23 N.'orking days added to the contract by time ext��nsions, when Yime has overran, <br /> 24 shali only apply to days o;� which liquidated darnages or direct engineeriny have <br /> 25 been charged, such as tkie following: <br /> � 26 <br /> 27 Ii substantial cornpletion has been granted prior to all of the authorized <br /> 2R working days being used, then the number of days in the time extension will <br /> � ;_9 eliminate an equal number of days on which direct engineering charges <br /> 30 have accrueri. If the substantial completion date is established after ail of <br /> I31 the authorized working day� have been used, then the number of days in <br /> 32 tlye fime �axtension will eliminate an equal number of days on which <br /> 33 liquidated damages or direct enginPering charges ha�e accrued. <br /> I <br /> � <br /> I <br /> � � <br /> � <br /> ENGLISH AMENDMENTS DIVISION 1 08.AP1 <br /> I JUNE 8, 1998 Page 1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.