Laserfiche WebLink
SECTION 1.07.23 Public Conveniencc And Safety <br /> ISECTION 1-07.23(1) OF THE STANDA'21)SPECIFICATIONS IS SUPPLEMENTED BY THE <br /> FOLLOWING: <br /> � I-p7.23(I) Canstruction Under frajfic <br /> The consVuction safety zone for this project is 10 feet from the outside edge of the traveled way. <br /> IDuring nomvorking hours equipment or materials shall not be wi,hin the ssfety zone unless it is <br /> protected by permanent guard rail or temporary concrcte barrier. The use oTtemporary concrete barrier <br /> � sh�ll be permitted only if tlae Engineer approves the installation and location. <br /> During the acwal hours �of work, unless protected as described above, oniy materials absolutely <br /> � necessary to construction shall be within tlie safety zone and only construction vehicles absolutely <br /> necessary to constraction shall be allowed within the safely zone ur allowed to stop or park on the <br /> shouldar of the roadway. <br /> IThe Contractor's nonessential vehicles and employees privaie vehicles shall not be permitted ro park <br /> within thc safety zonc ut any timc unless protected as described above. <br /> � Deviation from the above requirements shall not occur unless the Contracror has requested the deviation <br /> in writing and the Cngineer has provided written approval. <br /> ; <br /> SECTION 1-08 PROSECUTION AND PROGRESS <br /> � SF.CTION 1-08.3 OF THE STANDAIiD SPECIFICATIONS IS SUPPLEMENTED BY THE <br /> � FOLLOWING: � <br /> I 1-08.3 Progress Schedulc <br /> The third sentence of the second paragraph of Section 1-083 is revised to read as follows: <br /> IThe schedule shall be developed by a critical path,bar graph,or similar type method. <br /> SECTION 1-08.5 OF THE STANDARD SPECIFICATIONS IS SUPPLEMENTED BY THE <br /> � FOLLOWING: <br /> 1-08.5 Timc For Completion <br /> i This project shall be physically completed within 20 working days. Within 20 calendar days after execution <br /> by the Contracting Agency, the Contractor shall provide the Contracting Agency with copies of purchase <br /> orders for all equipment items deemed critical by the Contracting Agency including but not limited to signal <br /> I controller materials, lighting standards, and signal standards requircd for the physical completion of the i <br /> contract. Such purchase orders shall disclose d:c estimated delivery dates for the equipment. The contract � <br /> time will start on tlie day that the critical items are delivered to thc Contractor or are ready for delivery to the <br /> I Contractor from the Contracting Agency's Materia.ls Laboratory, or 1 GO calendar days after execution by the <br /> Contracting Agency, whichever occurs first. If the Contracting Agency does not receive a pu�chase order <br /> within 20 calendar days after execution by the Contractiug Agency, the contract time will start with the first <br /> Iworking day following the 20th calendar dny afier esecution of the contract. <br /> p WnvaWNV1�500_�pecManrymv.da' <br /> I David Gvans and Associates,Inc. SP-5 7�h Ava SFJIOOt6e3�Signel Modification <br /> lunc 1998 <br />