Laserfiche WebLink
f DIVISION 4i � <br /> IMISCELLl+NEOUS CUNSTRUC'fION <br /> SECTION 8-2a ILLUMINATIOI�`,TRAFFIC SIGNAL SYSTEMS AND ELECTRICAL <br /> I <br /> � All installations shall conform to Section 8-20 of the Standard Specificatiors except as modified by these Special <br /> Provisions. All material specificatior.s for illumination, traffic signal systems and electrical shall confortn to <br /> ISection 9-29 af the Standard Specifications except as modified by Section 9-29 of these Special Provisions. <br /> SECTION 8-20.2 Materials <br /> I SECTION &20.2(1) OF THE STANDARB SPECIFICATIONS IS SUPI'LEMF.NTED BY THE <br /> � FOLLOWING: <br /> I8-20.2(1) Equipment List and Drawings <br /> A) Shop Drawings For Traffic Signal and Luminaire Poies: Within 20 days following execution of the <br /> I contract, or approval of electrical subcontractor, the contractor shall submit shop drawings for the <br /> traffic signal and luminaire poles to be used on the project. Within 20 days following approval of the <br /> shop drawings the contrac:or shall submit a letter to the engiaeer certifying that the poles have been <br /> ordered and certifying the manufacturer's planned delivery date. <br /> � B) Gquipment Submittal For TrafTc Signal Equipment Within 20 days following cxecution of the <br /> contract the contractor shall submit 3 copies of complete catalog data for the folluwing items: <br /> I Traffic Signal Controller <br /> Load Switclies <br /> I Conflict Monitor <br /> Detector Amplifiers <br /> Preemption equipment <br /> i Loop sealant <br /> Vehicle&pedestrian signal heads&hardware <br /> Service cabinets <br /> Terminal cabinets <br /> The equipment shall be approved by the engineer in writing prior to the actual orderin�of the equipment. <br /> I <br /> v�.w<w.aou�msm_.��ro�•e� <br /> David f vnns and Associatcs,Ina SP-7 7th Ava SFJIOOtt16t.Signd Modification <br /> IJune1998 <br />