Laserfiche WebLink
� 1 SECYION 1-02, BID PROCEDURES AND CO�IDITIONS <br /> � 2 June 8, 1998 <br /> I 3 1-02.6 Preparation of Proposal <br /> I 4 The second paragraph is supplemented with the following: <br /> 5 <br /> 6 Any unit price that is left blank or dces not coniai� numeric figures will be <br /> I 7 conside�ed no charge for that bid item. The e�Rension for that bid item will aiso <br /> 8 be ireate� as no charge and raflected as such in the tutal contract price <br /> 9 regardless uf what has been pl;�ced in the extension column. <br /> 10 <br /> � 11 The eighth paragraph that begin�with 'Any firm doing...." is �'�leted. <br /> 12 <br /> 13 1-02.13 Irregular Proposals <br /> � 14 �tem "a" in item No. 2 is deleted. <br /> 15 <br /> i 6 Item "d" in item No. 2 is revised to read: <br /> � 17 <br /> 18 d. A member of a joint venture or partnership and the joint venfure or <br /> 19 partnership submit proposals for the same project (in such an instance, <br /> � 20 both bids may be rejected); or <br /> � <br /> il <br /> I <br /> I <br /> � <br /> I <br /> I <br /> 1996 ENGLISH AMENDMENTS DIVISION 1 02.AP1 � <br /> I JUNE 8, 1998 <br /> Page 1 <br />