Laserfiche WebLink
� 1 SECTION 1-04, SGOPE OF THE WORK <br /> 2 June 8, 1998 <br /> 3 1-04.1 Intent of the Cort�act <br /> I . 4 The second sentence is revised to read: <br /> 5 <br /> 6 Omissions from the contract of details of work which are necessary to carry out <br /> 7 the intent of the contract shall not relieve the Contractor from perfortning the <br /> 8 omittad work. <br /> 9 <br /> � �o _ 1-04.1(2) Bid Items Not Inaluded in the Proposal <br /> 11 This section is revised to read: <br /> 12 <br /> 13 When the coriirac? �pecifies work that has no bid item, and the work is not <br /> I 14 specified as being included wiiFi or ineidental to other bid items, an equitable <br /> 15 adjustment will be made in ac�ordance with Seciicin 1-04.4, unless that work is <br /> 16 c�stomarily considered as incid�n�al to other ftems. <br /> � <br /> I <br /> i <br /> � <br /> I <br /> � <br /> I <br /> f <br /> rNGLISH AMENDMENTS DIVISION i 04.AP1 <br /> JUiJE 3, 1998 Page 1 <br />