Laserfiche WebLink
COMPLIANCE <br />REOuIRED Ee <br />0 <br />INSPECTION <br />APPROVED <br />n <br />J <br />IMPORTANT: supply Information In the shaded area by checking the appropriate circles. <br />Disregard topics that don't descriue your building or equipment. DD NOS place checks In <br />the two left columns. <br />WSEC Foundation phase requirements: <br />Inspected by: <br />❑ O All structural panels such as plywood, particle board, water board, and oriented strand board shall be <br />fabled" EXPOSURE ]""EXTERIOR' or "HUD -APPROVED" (VIAQ, S.401.1). <br />❑ Q Insulation baffles shall be placed in attics/ceilings to maintain at least 1" ventilation space and extend at <br />least 6" vertically above batts or 12" vertically above loosefill insulation (S. 502.1.4.5). <br />All <br />Symbols used: <br />Page 2 of 6 <br />Izing efficiency required under the selected of <br />sus U.46 (Option 1) (D U,43 (Options 11) <br />s U.39 (Option `J) O s U.36(Option VI) <br />i shall be'(S. 502.1.5, 602.7.2, Table 6-1): <br />UAD (Option III, IV) <br />s_U.35 (Option Vlll 0 < U.32 (Option Viii) <br />= equals > greater than c loss than z greater than or equal s less than or equal <br />UPDATED SEPTEMBER 1991 <br />