My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8120 LARIMER RD 2016-01-01 MF Import
>
Address Records
>
LARIMER RD
>
8120
>
8120 LARIMER RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 5:14:07 PM
Creation date
2/19/2017 1:24:28 PM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
8120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i� <br />AMARC INC. ENGINEERS ARCHITECTS PLANNERS <br />- - ---- � <br />. ; �; � <br />_ , <br />_�._. -� � ,� ; �;, <br />� ��i �. . 1� 3 ; �� � i ' � ��� � �� � <br />� <br />11-30-95 <br />Nir. Dan Mathias, P.E. <br />City of Everett Public Works <br />3200 Cedar Street <br />Everett, Wa. 98201 <br />Re: Sewer Availability for 8120 Larimer Road <br />Proposed Plan per your letter of 17Feb95 <br />Dear Dan, <br />� ��LV�� <br />�D H'�J� �' C' o�— ��tc� <br />�OJ � <br />� � <br />o((�oE��`1 ���J15� G� �O� <br />l��Qo�G� �����i�l: <br />`l� � �,,�, r� �''� �so 2 ,� /� <br />���Q ��'��prg � S s art� <br />�,��'� ��,-�' � � �, l� I�.s <br />As a result of my meeting with you, our telephone conversatiors, my site visit, <br />and a review of the operating profile, both actual and pro;rct� �, of tF�e South End <br />Sewer Interceptor in the vicinity of 8120 Larimer Road, I v;c �:�' like to suggest <br />that a single residential user tap connection into the 30" o_��n;;ier ductile iron <br />pres�ure sewer be reviewed against the following: <br />1 Sewer tap inseition point to be at approx elev 138 with a 2" tap. This <br />elevation uses the City of Everett Datum. <br />2. Pump invert to be at or above elev 138. <br />3. Provide a residential pumping system that will be abie to meet the <br />head requirements, (estimated) for year 2020. <br />4. Design to provide for city access to valve shutoff on city easement, for <br />backflow protection by maintainable check vaive protected by a shutoff <br />valve ahead of the check at the pump station site, and that the <br />selected pump be able to discharge at approx 5gpni. <br />As to selecting the head requirements for the year 2020, I used the Hydraulic <br />Grade Lines drawing of 10-18-95 that you provided me at our 10-12-95 meeting. <br />in attempting to graph the curve for peak flows and peak heads, I arrived at a <br />possible peak head for year 2020 0: something like 97 to 102 feet. <br />1300 11�7TH AVENUF SE. SU!TE ��1 <br />BELLEVUE,WASHINGTON9800d <br />Y5 <br />FAX: (206) 453�2213 <br />PH: (206) 453•2212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.