My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8120 LARIMER RD 2016-01-01 MF Import
>
Address Records
>
LARIMER RD
>
8120
>
8120 LARIMER RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 5:14:07 PM
Creation date
2/19/2017 1:24:28 PM
Metadata
Fields
Template:
Address Document
Street Name
LARIMER RD
Street Number
8120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�lote: ihat whiie there is no way to be certain that peak flows will reach <br />240 in year 2020, it needs be remembered that peak flows are just that, <br />flows of short dur�tion, and that normal flows are significantly lower. <br />Also, LID efforts now under way, even if not successful in the short term, <br />most certainly will be sooner or later, and when that does occur, any <br />concerns such as this become moot. <br />As a result, I would suggest you consider approving our moving foreword with a <br />design anc� an application for connection to meet the following requirements: <br />1. Install one SPG Aurora Pump (Hydromatic Pump Grinder) having a 1- <br />1/4 inch discharge, and a 5 inch impeiler able to discharge SGPM at <br />97 feet of head. <br />2. Force main to be 2 inch pipe discharging through a 2 inch sleave <br />tapped into the 30 ductile iron portion of the South End Sewer <br />Interceptor. <br />3. Tap to be made by Speer Taps, or by a contractor ot the Cities <br />choosing. <br />4. Install a 2 inch shutoff valve at the 30 inch line. <br />5. Install a 2 inch check valve at Pump. <br />6. Install a 2 inch shutoff valve at pump to allow check valve servicing. <br />7. Install a 65 gal sewage ejector basin with simpiex steel cover. <br />S. Provide assurance that when LID comes into play, that 8120 Larimer <br />will join without any special provisions. <br />9 Provide assurance that should the LID not come into play beiore the <br />year 2020 or before the discharge head requirements exceed that <br />projected for the year 2020, that 8120 Larimer will install an upgraded <br />pump to accommodate this future situation. <br />Dan, if tl-�is approach satisfies conceptuafly realistic City requirements, we will <br />put together adequate documents showiny the specifics for City review and <br />approval prior to receiving final contractor proposals for installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.