Laserfiche WebLink
�lote: ihat whiie there is no way to be certain that peak flows will reach <br />240 in year 2020, it needs be remembered that peak flows are just that, <br />flows of short dur�tion, and that normal flows are significantly lower. <br />Also, LID efforts now under way, even if not successful in the short term, <br />most certainly will be sooner or later, and when that does occur, any <br />concerns such as this become moot. <br />As a result, I would suggest you consider approving our moving foreword with a <br />design anc� an application for connection to meet the following requirements: <br />1. Install one SPG Aurora Pump (Hydromatic Pump Grinder) having a 1- <br />1/4 inch discharge, and a 5 inch impeiler able to discharge SGPM at <br />97 feet of head. <br />2. Force main to be 2 inch pipe discharging through a 2 inch sleave <br />tapped into the 30 ductile iron portion of the South End Sewer <br />Interceptor. <br />3. Tap to be made by Speer Taps, or by a contractor ot the Cities <br />choosing. <br />4. Install a 2 inch shutoff valve at the 30 inch line. <br />5. Install a 2 inch check valve at Pump. <br />6. Install a 2 inch shutoff valve at pump to allow check valve servicing. <br />7. Install a 65 gal sewage ejector basin with simpiex steel cover. <br />S. Provide assurance that when LID comes into play, that 8120 Larimer <br />will join without any special provisions. <br />9 Provide assurance that should the LID not come into play beiore the <br />year 2020 or before the discharge head requirements exceed that <br />projected for the year 2020, that 8120 Larimer will install an upgraded <br />pump to accommodate this future situation. <br />Dan, if tl-�is approach satisfies conceptuafly realistic City requirements, we will <br />put together adequate documents showiny the specifics for City review and <br />approval prior to receiving final contractor proposals for installation. <br />