My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
500 LAUREL DR 2016-01-01 MF Import
>
Address Records
>
LAUREL DR
>
500
>
500 LAUREL DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 12:48:45 PM
Creation date
2/19/2017 1:37:04 PM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Monitoring REport Page 2 <br />00-2267-1 Hoban Residence Addition, Everett <br />February 23, 2002 <br />minute and the penetration aciiieved du� ing that period being recorded. Providing the <br />penetration was less than one inch the pile was considered acceptable. If the <br />penetration was greater than one inch, pile d�ving was continued until the refusal <br />criterion was met. <br />Based on the results of uur proof test monitorin� these pin-piles all achieved less than <br />one half inch of penetration. Thus, all of the installed pin-piles are considered to be <br />acceptable, and each is capable of developing in excess of four thousand (4,000) <br />pounds in allowable load bearing capacity. This meets, or exceeds, the original <br />project specifications. For informational purposes we have provided the results of the <br />pronf testing program in Table A, attached. Additionally, the identification numbers <br />and approximate pin-pile locations are shown on the attached Field Construction <br />Inspection Reports. <br />We appreciate the opportunity to have been of additional geotechnical assistance to <br />you on this project and trust that this information is sufficient to complete yc�ur project <br />records. Our work on this foundation construction phase of the project was <br />performed, and our opinions were d�rived, in a manner consistent with that level of <br />skill, care and competence ordinarily exercised by other members of the profession in <br />good standing currently practicing under similar conditions in this area only. No other <br />warranty, express or implied, is made. If you have any questions, or if we can be of <br />any further assistance, please call. <br />Very Truly yours, <br />CREATIVE ENGINEERING OPTIONS, INC. <br />Glen Mann, P.E. <br />President <br />Attachments: Field Construction Inspection Reports (2) <br />Table A; Pin-Pile Proof Test Data <br />grtVHoban Flnal Piling Monitoring RepoNebB4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.