My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1416 HEWITT AVE 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
1416
>
1416 HEWITT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 7:55:02 AM
Creation date
2/20/2017 8:17:09 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1416
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� < < <br /> EN6/NEER/N6/r!//L/C SrE/!Y/CE5 OErARTiNENT <br /> March 20,2009 <br /> Mr. Rick Lapinski <br /> PO Box 1978 <br /> Everett,Washington 98206 <br /> Project: Tenant Improvement for Retail <br /> Job Address: 1416 Hcwitt <br /> Plan Review No: B0903-033 <br /> Dcar Rick, <br /> 'Chank you for the application for a building petmit.'I'he plans have been examined and the submittal is <br /> incomplete. Plan review cannot commence until these issues have been addressed on the drawings. 'fhese <br /> comments addrcss building issucs only. Other departments(including Utilities,Planning and Fire)may require <br /> additional rcvisions or additions. <br /> Structural <br /> 1. 7'he new mezzanine requires a framing layout,support details and idcntification of thc materials used in <br /> the design. Structural calculations by a licensed Washington State engineer or architect are also <br /> requircd. <br /> • Details should show the size, thiclmess, materials and structural support assembly, per IBC <br /> 1G03.1. <br /> • Praming plans should indicate confortnance with the 2006 Intemational Building Cale with <br /> matcrinls,dimcnsioning,and conncctions cicarly indicated. <br /> • The storagc loading of the mcz•ranine should be identified per IBC table IG07.1,posted per on <br /> thc drawings and refcrenccd in thc cnginccring calculations. <br /> 2. A scismic analysis is rcquircd to changc thc use 1'rom a `E3' business occupancy(barber shop)to an `A' <br /> assembly occupancy(rcstauranUbar),per IBC section 3406.4. A scismic analysis would not be required <br /> for a mercantile,storagc or factory use,assuming that these uses are allowed in the zone by the Planning <br /> Department. <br /> Gencral <br /> 3. Plcase mvise the drawings to indicate new work,cxisting construction to remain and demolition of <br /> existing construction. 'The standard drawing convcntions would indicate new work with dark lines, <br /> cxisting with light lines,and conshvctian to be removed�vith dashcd lincs. <br /> 4. A code analysis should be included on thc drawings to vcrify occupancy,construction type,and <br /> applicablc codcs for the tenant improvement permit submittal. The occupant load and use of the <br /> mezzanine should also be stated on thc drawings. <br /> 5. Please indicatc on thc plans the customer arca for cither an assembly or mercantile occupancy so that <br /> the cecupant laad calculations can be detcrmined. <br /> G. Plcasc indicatc an thc drawings whether the scopc of work is to include one or two toilet rooms under <br /> this pcnnit. <br /> CITY OF EVERETT � 3200 Cedar Street • Everett, WA 96201 • (425) 257-8800 • Fax (425) 257-8856 ��f/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.