My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1416 HEWITT AVE 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
1416
>
1416 HEWITT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 7:55:02 AM
Creation date
2/20/2017 8:17:09 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1416
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ( (- <br /> Exlting <br /> 7. Two exits swinging in the direction of egress travel would be required for an assembly occupancy,or <br /> for any occupancy exceeding 49 people.per IBC section 1008.1.2. Pleasc revise the cecupant load by <br /> indicating a walls to separate restrict the occupant load t.,49 or less,or revise the swing of the door on <br /> the back of the building to swing in the direction of exit travel. <br /> • Additional information on the Ooor plan is required to identify the property line and the egress <br /> to a public way for the rcar exiL <br /> 8. The mezzanine requires at least one means of egress to be shown on the drawings,per IBC section <br /> 5053. <br /> • The edge detail of the mezzanine should bc indicated as either a 42 inch guard,per IBC section <br /> 1013,or a wall,per the exceptions to the openness requirements of IBC section 505.4. <br /> Accessibility <br /> 6. Interior elevations are required for the toilet room(s)to indicate the location and mounting height of the <br /> lavatory,toilet,grab bars,toilet dispensers and other accessories. <br /> Interior Environment <br /> 7. Interior elevations and a building section am required to indicate a minimum ceiling heights of 7'A"in <br /> the toilet rooms,per @C section 1208.2, 7"-6"at the means of egress,per IBC sections 1003.2,and 7'- <br /> 0"at the meuanine,per BC section 505.1. <br /> 8. The wall finishes within 2 feet the water closet in the toilet room should be indicated on the drawings to <br /> have a smooth,hard,nonabsorbent surface to a height of 4 feet above the floor,per�C scetion 1210.2. <br /> 9. A smooth,hard,nonabsorbent flooring material should be indicated on the drawings to extend 6 inches <br /> up the wall,per IBC section 1210.1. <br /> Upon submission of two insert sets of revised drawings reflecting the corrections requested,your application <br /> will be processed. Applicable codes include the 2006 International Building Code(IBC); the 2006 Intemational <br /> Pire Code(IFC);the 2006 Intemational Mechanical Codc(IMC); the 2006 Washington State Energy Code <br /> (WSEC); the 2006 Washington State Ventilation and Indoor Air Qualiry Code(VIAQ); and the 2003 Accessible <br /> and Usable Buildings and Facilities ICC A 117.1-2003.Thcse referenced codes arc as modified by the State of <br /> Washington and as adopted per the Everett Municipal Code. <br /> All required submittals must be of sufficient detail and information to ensure lhat the proposed structure will be <br /> constructed in compliance with all adopted codes. You can reach me direcNy to discuss this letter by e-mail at <br /> mhalcy(t�ci.cvcrctt.wa.us or by phone at 425-257-8813. <br /> Sinccrely, <br /> � <br /> eg Icy, CAFtB <br /> Plans Exami er <br /> � <br /> �__ <br /> IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.