My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2915 HEWITT AVE 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
2915
>
2915 HEWITT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 10:54:04 AM
Creation date
2/20/2017 9:07:59 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T� <br />FROM <br />DATE <br />BOARD OF ADJUSTMENT <br />REIll H. SHOCKEY <br />DECEMBER 30, 1974 <br />SUBJECT CITV OF EVERETT, EVERETT, WASHINGTON <br />STAFF REVIEW--VARIANCE REQUEST <br />&�N NEL4LAND, 2900 BLOCK, H�WITT AVENUE <br />J, i - <br />-• c <br />_]!�_uV-' <br />I. P.EQUEST %c—/. _ �=�F'�,�i= <br />' Mr. Newland is beginning preparations to upgrade the several <br />buildings on the north side of ilewitt Avenue in the 2900 <br />Block (between Pine and Maple). As provided in the Zoni.ng <br />Code any structural alteration of an existing building <br />requires full compliance with the parking standards. In <br />this case, a remodeling of approximately 17_ 5�25 s qu�are <br />feet of building area wotld necessitate �e_ventv-two�parking <br />spaces. Mr. Newland wishes to provide only<.twenty-six, � <br />�' ' <br />II. ARGUh1ENTS IN FAVOR: ' <br />� �` <br />A. There should be some flexibility in this case to pro- <br />vide incentives for a private rehabilitation effort. <br />B. There is significant historical and architectural sig- <br />nificance attached to the buildings on this block. <br />C. There is non-metered, on-street parking which will be <br />available during peak activity periods. Other uses <br />in the area will not place substantial demands on this <br />parking. <br />D. The applicant has negotiated with the Bank of Everett <br />seventeen additionai spaces for use after the Bank's <br />_ 5:00 P.M. closing time. This parking is directly ad- <br />jacent to the remodeling project, across Pine Street. <br />E. The a�,plicant has indicated his intent to negotiate <br />�vith other property o�aners for additional parking <br />but these are all tentative. On the other hand,the <br />financing dictates that liis project commence immedi- <br />ately, thus the Variance. <br />II2. ARGUPI�NTS AGAINST: <br />A. This is a substantial variance from the Code and could <br />conceivably establish precedents for reductions request <br />in other locations. <br />B. Tliere are some residential properties to tlie north of <br />this facility �ohich could be impacted by par;:ing on <br />adjacent streets. <br />C. If this project leads to additional rehaUilitation efforts <br />in the Riverside area, there could be increased congestion <br />caused by a lack of uff-street parkiny. <br />T�. „�,..�mr,,.... <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.