Laserfiche WebLink
City of Everett <br />Date i i --i — % <br />Fixtures <br />No. <br />Permit Fee <br />-� o a <br />_1 <br />Bath Tubs <br />Clothes Washers <br />Dental Units <br />Dish Washers <br />Drinking Fountains <br />Floor Drains <br />Kitchen Sinks <br />Roof Drains — Rainleaders <br />Shower Baths <br />Service Sinks <br />Bar Sinks <br />Septic Tanks — Drain Fields <br />Sumps <br />Urinals <br />water Closets <br />Water Heaters <br />Wash Basins <br />Laundry Trays <br />Food Disposals <br />TOTAL FIXTURES <br />_ <br />Permit Fee . . . . <br />Plumbing Permit <br />DEPARTMENT OF PUBLIC WORKS <br />3J 2_p <br />INSPECTION DIVISION <br />I <br />Owner <br />Plumber 2 O U/j <br />City of Everett, <br />—IMPORTANT NOTICE — <br />All work must conform to the requirement of the City of Everett Plumbing <br />Code. It shall be the responsibility of the permit holder to see that the City <br />Inspection Division is notified for inspection before covering. <br />This Permit shall expire by limitation and become null and void if work <br />authorized hereon is not commenced within 60 days from date of issue or if <br />work so authorized is abandoned after commencement fora period of 180 days. <br />Remarks and Corrections: <br />Roughing In — Date Inspector <br />Roughing In — Date Inspector_ <br />Final — Date Inspector <br />This Permit must be posted on Job before starting any Plumbing Work. <br />Permit 3,07 <br />