My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 HEWITT AVE 2018-01-02 MF Import
>
Address Records
>
HEWITT AVE
>
3120
>
3120 HEWITT AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 2:23:13 PM
Creation date
2/20/2017 9:09:56 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
3120
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />I <br />Page 2 <br />3120 Hewitt <br />November 25, 1975 <br />9. Walls and ceilings of corridors should be of one -hour <br />fire -resistive construction. Section 3304(g). An <br />architectural section through the corridor is necessary <br />to determine how this is accomplished. <br />10. Interior openings into corridors should be protected as <br />specified in Section 3304(h). <br />11. Handrails should be placed not less than 30 inches <br />nor more than 34 inches above the tread. Section <br />3305(i). Two handrails are required where stairways <br />exceed 44 inches in width. <br />12. Guardrails for stairs, balconies, and landings should <br />conform with Section 1714. Note that maximum clearance <br />between intermediate rails is 9 inches. <br />13. Panic hardware is required on exit doors serving Group <br />B Occupancies having an occupant load of more than 100. <br />Section 3316(a). In lieu of this, doors shall have no <br />locks or latches. <br />14. Provide heating and ventilating plans and specifications. <br />15. Structural columns shall be one -hour fire -protected. <br />Table 17-A. <br />16. Provide details of exterior stairway. Section 3305(m). <br />17. Change in elevations of less than 12 inches along any <br />exit serving a tributary occupancy of 10 or more shall <br />be by ramps. Section 3301(k). <br />A Building Permit will be issued upon receiving a reply by <br />return mail or personal deliverance stating compliance with <br />this plan check letter. <br />Yours truly <br />Jamie Johonson <br />Inspection Supervisor <br />Ken Callahan <br />Plans Examiner <br />JJ:KC: eb <br />cc: Fire Marshal <br />
The URL can be used to link to this page
Your browser does not support the video tag.