Laserfiche WebLink
Mr, Tom On3shi <br />August 30, 1973 <br />Page 2 <br />which was expected since it was very difficult to compact the fill placed <br />underneath the slab. A small amount of settlement may still occur and <br />may require some additional maintenance. <br />Light poles and their installation appeared to be satisfactory. <br />Based on this inspection we recomr.�end that the Port of Everett accept the <br />project as being substanti�liy completed and request an occupancy permit <br />from the City of Everett, The City of Everett has been notified that this <br />portion of the project is complete and final inspection should be made if <br />the City deems it necessary. <br />Sincerely, ` � <br />i/ <br />. ' LQ �>A` <br />L. P. JdKnson <br />President <br />LPJ: lp <br />cc: City of Everett <br />Swan Wooster Engineering, Inc. <br />General Construction Company <br />Dames & Moore <br />EDA <br />������r�� <br />AU G z a 1973 <br />CITY OF EVERETT <br />Inspection Dept. <br />