i ,AL DECLARATION 0OF NON -SIGN CANCE <br />92 <br />1 <br />Description of Proposal: <br />The proposed action is the issuance of grading and building permits to allow the construction of a <br />19 unit apartment building. The following factors were considered and tlle listed requirements <br />placed in response to comments received from various City de},)artments after their review of an <br />Environmental Checklist for this proposal. <br />1. The site is zoned B-2, Community Shopping Zone, wf Please circulate <br />zo � - -i <br />2. The site is currently vacant. The eastern portion c-- <br />the foundation of a previously existing residence ren Larry Crawfor <br />Loner <br />3. Access is via Highway Place. Gordont <br />r <br />q. Parking must be provided in compliance with Zoning Craig <br />yard setback may not be utilized for parking. Dennis G +��c:nilnl <br />y-f 1 Sr s <br />5. Domestic water service can be provided by the exi: Jerry Carroll h <br />cannot be met to adequately serve this sib. The ` 7(hift 7 <br />will have to be extended at the developer's expense' Clair Oliver to <br />Herb Boushey d <br />6. Drainage from site must be collected and transf Ron Cameron <br />methods. - <br />y, A detailed drawing shall be submitted to the Pub Send back t Cathy Gort o <br />Mgr, layout, landscaping, driveways, utilities, storm drai when comple —. d <br />the public right-of-way. Public Works Department before any permits are issued. All impro•,ements si Thank you! <br />y <br />Permit is issued. <br />As-builts, easement, and a one year Warrantee Bond in the amount of 1 o% of the cost of <br />construction of the public water system are required within 10 working days of obtaining <br />public water connection. <br />S. City streets are to be kept clear of dirt and debris during construction. <br />9. During construction, all truck traffic to and from the site within the City of Everett shall <br />i be on arterial streets unless otherwise approved by the Public Works Department, <br />The approximate sewer connection fee based on the preliminary informati)n provided is <br />10. <br />The per apartment unit. The actual cost shall be computed by the Building Department <br />$143per the ordinance in effect at the time and according to the information provided on the <br />approved plans on the date of permit issuance. <br />11. On -site detention is required. Drainage calculations must be submitted on a City Drainage <br />Plan submission form. Reseeding of exposed eart'a is required within 30 days of completion <br />of earth work. A temporary erosion control plan must be approved by the Public Works <br />Department prior to issuance of any permits. <br />12. A preconstruction cenferenc� on Civil Engineering portion of project :s required prior to <br />e.,pproval of Public Works Permit. The Applicant shall arrange meeting involving Applicant, <br />job superintendent, contractor, all subcontractors, Fire Marhsal, Planning Department <br />ent Coordinator, Public Works Coordinator, Public Works <br />Coordinator, Building Dep .rtm <br />Inspector, and City Traffic Engineer. <br />13. Compliance with all provisions of Street Improvement ordinance 555-78 are required as <br />appropriate. <br />U ,C47-Cc0"t7II, <br />J <br />�1 <br />