My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6110 HIGHWAY PL 2016-01-01 MF Import
>
Address Records
>
HIGHWAY PL
>
6110
>
6110 HIGHWAY PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 2:33:22 PM
Creation date
2/20/2017 9:44:06 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
6110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. FF � .'u'� ..... � a _. - . - .. - � .[� . � � -c_. <br />y � r.,> <br />�-. . � ..f4�_�` , .. . --. . , . � _ � � . i.� '+` ..- <br />x .? ' ,i � � . . Y.`ag* <br />"V" ehaped grooves. one quarter (-h'-) inch i.n aepth shall be made <br />wtth a suitable tool, dividing the tvalY into biocics three (3) feet <br />equare. The marking shall be done in a workmanlike manner. �sroovee <br />shall be a�.right angles "to the walk. Outer e�e walk shall be round- <br />edto one-half (-�) inch radius. <br />60.--Expansion doints; <br />TYie aidewalk sHall ti'e poured iri aectione correaponding to the <br />paTapet wall sections, and eXpansion joints of felt and asphaltwn as <br />specified.�mder parapet wall� shall be placed ns a continuation of the <br />expaneion joints of the wall: This joint filler shall be foiu (4) <br />inches wi�! and three•aixteenths (3/16) of an inch thick, and shall ex- <br />tend through the entire thiolmees of the concrete. <br />61.--Curing: <br />The surfaae of the walk shall be sprayed with water as soon ae. <br />the concrete is eufficiently hard�ned to revent pitting, and shall be <br />k�pt contlnuously wet foi at least seven �7) days. Should'the Water <br />Su erintend�ent so direct, the waTks shall�be covered to a depth of two <br />(2� inches with suitable earth and kept moiet by aprinkling for at <br />leaet aeven (7) days. <br />62.--Payment: <br />The price bid shall be per bubic yard for concrete in plaae as bid <br />for "3idewalk" rvhich shall inblude coat of expunaion jointa� grading, <br />forn�9� and all other labor and materia3 necessary to produce a finished <br />walk• <br />62a.--Inlet and Over Flow Chambers: <br />There will be Inlet and Overflow Chambers aa shovm on the plan�. <br />They will be �de of Class "B" Concrgte. The price bid for"Conerete <br />7nlet and Overflow C hambeTs" shall be per cubic yard anii ahall �nclude <br />the coet conplete in place. including all labor anil materiul incldental <br />thereto, excepting excavation� which ahall beir_cluded 1n the pTice bid <br />for °S'xcavation." <br />62b.--Valve C1'►amber: <br />TheTe pi12 be a Concret� \*al�e Chamber as�shown en the plans. It <br />vPill be made of Ciaes "D" Conerete'.' Tkie price bid for "Concrete :�•� ' <br />ValveChamber sha1T be per aubic'qar� and sriall include the coEt complet� <br />in �,lace. incTuding all labor an8 materia! lncidental thereto, exce�tin�; <br />excavation� vhiieh ehall be included in Lhe price bid for"SXcavatiion . <br />2�, c <br />
The URL can be used to link to this page
Your browser does not support the video tag.