Laserfiche WebLink
63. --C ONC REf E C iTf�OFF WALI, IN R07�LED EPIBANHI+�ENT : <br />There will be a concrete cut-of'f wall constructed in the deepeSt <br />portion of tHe roaled embanlvnent, of a size and dimenaion aa may be� <br />determined on by the Water Superintendent �:aen stripping the area undar <br />tha rolled embanlonent is completed, It ehall be of Ciase "C" conorete� <br />Ita° construction will be in conformity with the conorete specification <br />hereinbefore givan. _ <br />She pTice bid per cubfo yard for "Concrete �ut-bff�wall in Rolled <br />mnDankment" shall include the cost co�uplete in place. including all <br />lab�or and materi�l incidental thereto, exaepting excavation.. <br />The excavation for thie wall shall beinclu�ded in and be paid for <br />at the price bid Yor "Psasavation." . <br />64. --OMITT�: <br />65..•C ONCRETE WASTL+ WA TER HAFFLE: <br />A conCrete r►aet'e water baffle will be conatructed erqptying into <br />creek about five hundred (500) Seet from basin site. <br />It ahall be conatructed as per psana. ofClaes "B" conorete in s. <br />worlon�nlike manner and as per apecifications for conorete• hereinbefore <br />Biven. <br />The price bid ehall be per cubia yard of"Concrete Waste �Tater <br />Baffle�" 1n place and nhall includs Lhe coat of aIl material and labor <br />inaidental thereto. <br />66.�-pa�T: <br />Concrete will be paid for at the contract price for the varlous <br />classee of cot�rete• payrnent being made for the actual volume in <br />place contalned withln the lines of the plans furnished by the Water <br />5uperintendent.� Cantract price will include furnishing all materiale <br />for concrete. and all material� and labor incidental to construction <br />of forms. All excavation for foundation piis will be allowed a nd <br />eatimated as e�acavation, as set forthin these epecificatione unlee9 <br />otherRise etipulated. <br />23, <br />