Laserfiche WebLink
� <br />�?•-^B�;IN�`0!?CF,,�ED1T sTr'�L: <br />Reinforcem�nt steel sriall conform to the �pecifications for Billet <br />"tesl Ccnerets Reinforcement Bars--Serial Designation A. 15-14� page <br />^� �f the Q15 Ye:�r 3eok, of the �merican Society for Testing Materiale. <br />i+B.I'3 :.ral? re oi tre defor:ied. type and if cold twisted bara are used <br />tY.eir ;h.ysir,al p:opar�ies :,hall r� de+•erreined 'oeiore they are twisted� <br />b�,-..PLAC It: G .S'q'EF;?, R:�I*Ir'QkC�S�I7': <br />Ste�l reinforce:aent aha)1 be placed iii exac# Foaition indicated <br />er. th� dra�ring� e.nd h„�c? $2cnrel,y in pcsition during the placing af the <br />u�r�c^�te. ;.il abrupt bends shall be avoided e�ccept where steel member <br />is �>nt arow;d another. The steel shall be free from dirt. oil. paint. <br />gr.ease�, �cili scale or loose ruat befora' concrete ie placed. A11 rein- <br />fcr�:�ent bars shall bebent cold, to the dimeneions and forma shwon on <br />+he d-av�in�s. before they are placed in poeitfon. The forming arid b�etd- <br />',ng sl:all be accurately accomp2ished in a beniing machine. <br />�9•--•ANCHOR BOLTS: etc. <br />All anchor bolts. �;rab-irona, ladder a.nchore. and all aupporta <br />whicn are to be built in the concrete shall be furnished and placed by <br />the Ccntractor at the exact location and elevation Ca12ed for on the <br />drawinge. They shall be free from dirt, oil, paint. �rease. mill ecale <br />or looee rust at the time of plae�ing the conerete. The coet oi finieh- <br />ir.g and placing such shall be included in th• price bid per pound for <br />"Reinforcing Steel" in place, unlesa otherwise specifieally provided in <br />the proposal. <br />'%0. -�PAYMffi�IT : <br />Al1 reinfoxcement <br />in place in accord with <br />otherwiae etipulated. <br />71--CRAVffi-DRAINS: <br />steel mill be paid for at the rate bid per pound <br />the atipulations uf theae Specificatione� unlesa <br />On the high aide of all concrete ribs, which wiTl include all ribs <br />in the floor of the basin, and all horizontal riba on the smopes of.�the <br />basin. except the middle horizontal line of ribs on the reservoir slope, <br />�hall be formed a trench twc (2) iriohes wide lvith vertical side, to tl:e <br />depth of the bottom of the riba, by esing and removing two (2) inch <br />�lank for forms for the concre'�e ribs. <br />29. <br />