My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1212 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1212
>
1212 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 3:44:20 PM
Creation date
2/20/2017 3:44:03 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1212
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 31, 2008 <br /> Mr. Paul Tessier <br /> L&A Job No. 8A027 <br /> Page 7 <br /> dense sand ancUor hard silt soils laycr in arcas of the proposed additions to the existing residence <br /> and the new garage. The exposed soils after stripping should be compacted to a non-yielding <br /> statc with a mechanical compactor. During constcuction, one or multiple lines of interceptor <br /> trcnch drains should bc installed along the uphill side of the site and behind the crest of the steep <br /> slopc, as rcquircd, to intercept and drain away surface runoff and near-surface groundwater <br /> scepage to facilitate grading and foundation construction work. Water collected in such <br /> interceptor trench drains should be convcycd into a nearby street side storm inlet. The stortn <br /> inlet should bc covered with a filter sock to prevent sediment fmm entering the stortn sewer <br /> system. Thc filtcr sock shoulJ be cleancd perioJically to prevent it tiom clogging,and should be <br /> removed aRer lhc construction work is completed. <br /> The onsite surticial soils contain a high percentage oC fines and are sensitive to moisture. A layer <br /> of cican quarry spalls should lx placed, as required, over cxcavated areas and are:u of frequent <br /> traffic to protect the subgrade soils from Jisturbance. Silt fences should be erected along the <br /> downhill sidc boundaries of the site to prcvent sediment from bcing transported by storm runoft' <br /> onto adjoining propertics, thc street or the adjacent sleep slo�:. The bottom of silt fence filter <br /> fabric sl�ould bc anchorcd in a trcnch fillcd with gravcl. <br /> F,XCAVATION SLOPES <br /> Under no circumslance should excavation slopes be grcatc: ihan the limits specitied by local, <br /> state and fcderal safery regulations if workers have to pedortn construction work in excavated <br /> are:+s. Unsupported tcmporary cuts grcatcr th:ui 4 fect in hcight should be no steeper than 1 H:l V <br /> in thc surficial topsoil and weak soils in the root zone, and no steeper than 1l2H:lV in the <br /> underlying dcnse sand and/or harJ silt soil layers. The soil units and lhe stability of cut slopes <br /> should tx vcrificd by a gcotcchnical enginccr durmg cxcava,�on. <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.