Laserfiche WebLink
i � <br /> This determination shall terminate if the applicant does not apply for a building permit within 18 <br /> months (or, with an extension, 24 months) of issuance of a final threshold determination, except <br /> where a time limit on the land use permit is othervvise established under federal or state law, city <br /> ordinanc� or an executed development agreement. <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the applicant's benefit. These are not SEPA conditions but are <br /> associated with other laws or requireme�ts. All requirements are preliminary in nature, and are based upon <br /> the project description and ordinances in effect at time of submittal for SEPA review. Approval of <br /> construction plans will require demonstration that all pertinent standards and regulations, whether stated <br /> here or not, are met. <br /> 1. A Building Permit anc' Side Sewer Cap-otf Permit will be required for the demolition of the existing <br /> structure. <br /> 2. A Building Permit for construction of the replacement residence and adherence to the Liu 8 Associates <br /> Geotechnical report are required. <br /> 3. Considerations in the design of lhe new house must be made to adhere to the recommendations set <br /> forth in the geotechnical report. <br /> 4. Any broken or damaged street-side sidewalk must be replaced by the applicant. <br /> 5. City streets are to be kept clean at all times during construction activities. <br /> ; � <br /> 3I 3� <br /> � '� <br />