My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1326 GRAND AVE 2018-01-02 MF Import
>
Address Records
>
GRAND AVE
>
1326
>
1326 GRAND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2022 3:48:31 PM
Creation date
2/20/2017 4:09:21 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � ( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect sfde sewer per City Standard#'s 601, 602, 604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooflop runoffi must be discharged to a roof downspout fnfiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wfde,2'deep and 25' long. See attachment for <br /> more detafls. <br /> � The contractor must meet with the Public Works Inspector to discuss potential drafnage rouNng prior to <br /> beginning the project. <br /> 10. Install erosion control measures as delermined by the Public Works inspector, such as silt fence, slraw <br /> bales, swales,or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No buitding materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 76. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i,e.all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Contact lhe Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure Iine must discharge into a private manhole, then <br /> gravity Flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Slandards <br /> 13D. <br /> PWComments <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.