Laserfiche WebLink
( <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> � Connect all rooHop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoffi must be discharged lo a roof downspout infiltralion system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more deteils. <br /> /y.� The contractor must meet wilh the Public�Norks Inspector to discuss potential drainage rouQng prior to <br /> �-� beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales,or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for smali parceis <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation,sidewalk and driveways shall be hauled to an approved, <br /> permitled site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onlo roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewaiks to be kept clean and open for <br /> pedestrian travel. <br /> 16. .4djust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A&306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to tho street paving. <br /> 20. Contact the Water District for connecting provisions for lhis building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan�/402 wilh a gas lrap per Standard Plan#410 is required for lhe <br /> parking area. <br /> 22. If a sewer pump system is to be inslalled, lhe pressure Iine must discharge into a private manhole,then <br /> gravity flow across lhe public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requiremenls of NFDA Standards <br /> 13 D. <br /> PWComments H/ ► <br /> C l�%% <br /> J <br />