� <br /> D-1557 Modified Proctor method. We recommend that a representative from a <br /> qualified testing lab be on-site to monitor the placement of the fill and verify <br /> that the required compaction is achieved. Compaction tests should be <br /> pedormed at a frequency of one test per lik per 2,500 square fcet,or 500 lineal <br /> feet of trench. Due to the elevation of the water table, it may be difficult to <br /> place the structural fill at the base of the excavation. Stabilizing the base with <br /> crushed rock placed at the first lift of the stnutural fill may be necessary. <br /> Foundatlon Support <br /> Based upon the results of the subsurface exploration, it appears that after the <br /> cut is made for the basement,the foundation may be placed upon the dense <br /> sands and stiff silts which have adequate bearing capacity, However,due to <br /> the proximity of the stnuturo to the top of the slope those foundations within <br /> 15 feet of the top should be plsced upon drilled piers to support the foundation <br /> without loading the top of the slope. The remaining ponions of the stnuture <br /> may be placed upon a conventional spread footing. <br /> Footlngs <br /> The following criteria should be utilized in the design of the conventional <br /> spread footings: <br /> Maximum allowable bearing capacity: 3000 psf <br /> Friction against sliding: 03� <br /> Piles <br /> Drilled piers should be used for the support of all foundations within I S <br /> feet of the top of the slope. We anticipate that the piers may be drilled <br /> using open hole techniques,however, the contractor should have casing <br /> available to provide support of the pier excavation if needed. The piers <br /> should be a minimum of 16 inches in diameter, although larger diameters <br /> may be used. <br /> Cach pier should extend to a minirtmm depth of 20 feet below the finished <br /> basement elevation. If this criteria is used, the maximum allowable axial <br /> capaciry should be limited ro 15 tons per pier. Lateral capacity oF each <br /> pier will develop by an area over two times the diamerer of the pier, with a <br /> fluid equivalent pressure of 250 pcf and a point of fixiry located 10 feet <br /> below the surface. <br /> A one-third increase in allowable bearing capacity may be assumed in the <br /> design for short-term loads such as a seismic event or wind loading. We <br /> recommend that the soils engineer inspect all footing and pier excavations <br /> prior ro concrete placement to assure bearing capacity and that the conditions <br /> of the excavation are as anticipated. � <br /> Port Gardner Condominlums•GeotecMicel Repon Page 6 <br />