My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1920
>
1920 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 5:22:20 PM
Creation date
2/20/2017 5:21:48 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1920
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> ' es of bindin <br /> that landsc in on interior lot Im g <br /> Section 7.F3(j)ofthe Land Division Ordinance states ap g <br /> site plans may be waived if the City has approved a site plan and master landscaping plan for the tota! <br /> site. <br /> Section 7.F.16.g. states that the Director may modify the Everett Zoning Code requirements for lot <br /> width, depth, azea, frontage, and setbacks on interior lot lines. <br /> Section 7.F.16.j. states that individual lots in a binding site plan are not required lo provide parking <br /> on each lot to Zoning Code requirements as long as the City has an approved site plan for the total <br /> site and parking is provided to Everett Zoning Code standards for the total lot subject to the binding � <br /> site plan process. Parking will meet Zoning Code requirements for the site as a whole. i <br /> � <br /> Conclusions: The proposal will comply with Zoning Code standards. Compliance must be � <br /> demonstrated prior to issuance of a building permit and occupancy pertnit. Landscaping should not <br /> be required on the lot lines benveen the buildings, where common access is provided. <br /> 3. Natural Environment-The Binding Site Plan, site plan, and other required application infortnati.on <br /> shall meet the requirements of Environmentally Sensitive Area Regidations of the Everett Zoning <br /> Code, Title 20, Everett Municipal Code(Environmental Policies), and the State Environmental Policy <br /> Act, WAC 197-11. <br /> FindinRs: A SEPA review was conducted for this proposal and a Mitigated Determination of was ; <br /> issued. The project must show compliance with all zoning code requirements at time of submittal fo� ; <br /> building permits. The applicant also proposed modification of a geologically hazazdous slope. A <br /> geotechnical report was completed and a decision issued (REVII#6-99). The applicant must comply I <br /> with all requirements of REVII #G-99, as revised.) <br /> I <br /> Conclusions: All State Enviromnental Policy Act requirements and zoning provisions related to <br /> environmental protection have been met. <br /> 4. Public Services: 1'he proposed project shall be designed to meet the following: <br /> (i) Adequate Water SupQlv to Citv Standards: <br /> Findines: This site has an existing water main on the property frontage that can serve this �ite. The <br /> fire Flow requirement for the proposal is 1,500 GPM. i <br /> Conclusions: Adequate water supply will be available to the site. I <br /> � <br /> i <br /> (ii) Adequate SewaQe Disposal to City Standards: I <br /> FindinAs: The proposal must connect to public sewer mains in the frontage. All connectians must � <br /> be made per City Standards. <br /> Conclusions: Adequate sewage disposal will be available to the new lots. � <br /> 14 �y I <br />
The URL can be used to link to this page
Your browser does not support the video tag.