Laserfiche WebLink
PL�NN/NG ANO Allan Giffen <br /> CO�NA�IUN/TY DEI/ELOPMENT Director <br /> r <br /> August 2, 2004 <br /> Frank �onipart <br /> 7429 N Meadowdale Rd. <br /> Edmonds, WA 98020 <br /> RE: 1926 Grand Avenue Tripiex <br /> Dear Mr. Bonipart: <br /> The City of Everett received a building permit application on June 29, 2004 for the <br /> construction of a triplex on the above referenced property. The project was reviewed <br /> lhrough the SEPA process and a Final Mitigated Determination of NonsigniFicance was <br /> issued on April 5, 1999. In addition the project was approved for a Modification of <br /> Multiple Family Standards, Modification o(Retaining Wall Height, and a Steep Slope <br /> Aiteration. In order to proceed with review of the building permit application the foilowing <br /> informalion will need to be provided. This information is only that which is required by <br /> the Planning Depariment; oli�er City departmenls and agencies may require additional <br /> information, once they commence their review. <br /> 1. Special construction is required in order to ensure that interior noise leveis do not <br /> exceed �5dBA. Construction must include the sound altenuation measures <br /> includeo in the December 23, 1998 letter from JR Engineering (copy of which is <br /> on file with the City). Please provide a letter summarizing how ihe sound <br /> attenuation has been met on the proposed constru::tion plans on file with <br /> the City, including specific pages and details. <br /> 2. The City of Everett approved a Steep Slope Alteration application (REVII #6-99) <br /> on April 5, 1999. Several conditions of approval were contained in the decision <br /> document. These conditions shall be met on site, including the following: <br /> a) P copy of the final construction plans including grading and building <br /> plans, must be reviewed by David Evans and Associates to insure that <br /> the recommendations of the geotechnical report are adequately <br /> addressed in the building design. A written determination that the <br /> construction plans meet the requirements of the geotech�ical report <br /> must be submitted to the Planning Department prior to issuance of <br /> building permits. (Condition #2 REVII#6-99) <br /> b) Representatives of David Evans and Associates must monitor the site <br /> during excavation to ensure that the recommendations of the <br /> geotechnicai report are adequaiely implemented. The geotechnical <br /> engineer must provide the Planning Department with certification <br /> that the construction is in compliance with their recommendations. <br /> (Condition #3 REVII#6-99) <br /> � <br /> CITY OF EVERETi' • 2930 Wetmore Avenue, Suite 8-A• Everett, WA 98201 • (425) 257-8731 • Fax (425)257-8742 <br />