Laserfiche WebLink
� i <br /> Justin Oeemene <br /> Page 2 <br /> June 11, 1990 <br /> APIIRTMENT - MITIG7ITION <br /> Thi• project will fall in the pr�sant boundariee of Whittier <br /> Elementary and North Middle Schools both over capaoity. <br /> However, Everett High School ha■ capacity at this tima. <br /> The Everett School Di�trict ha• found that each apartm�nt <br /> unit throughout our service area generatea . 327 students to <br /> the Dittrict's student. population. with 9 units, thi• <br /> project would genera�e 2.39 atudents. since Everett High <br /> School ha• capacit�, those students are not L-igured into <br /> this calculation. <br /> Portables cott $36,040 to con�trnct and locate on ■ite. <br /> Twenty-five (251 students can be hou�ed in each portahla. <br /> Thus, it co�t• $1440 per etudent to house atudent� in <br /> portable�. <br /> The applicant'e mitigation in tihi• case would be 2.39 <br /> •tudents x $1440 = $3.441.60. <br /> Thank you for an opportunity t� re�pond. <br /> Sinc.erely, <br /> Chuck Patten <br /> Director of Community Relation• <br />