My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 GRAND AVE 2018-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2030
>
2030 GRAND AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 3:26:14 PM
Creation date
2/20/2017 6:05:13 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2030
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JRR Engineering, Inc. <br /> � I8609 76�'Avcnuc West, Suite B � <br /> L}mnwood, WA 98037-4149 <br /> Phonc: (425)697-5108 <br /> Fua: (425) 697-4506 <br /> July 25, 2006 <br /> Bob Christensen . <br /> Christensen Quality Homes, Inc. <br /> 2030 RuckerAvenue, #4 <br /> Everett, WA 98201 <br /> SUBJECT: QualityAssurance Plan, 2030 GrandAvenue, JRR# 00-30A <br /> REF.: B0605-017 <br /> Dear Mr. Christensen: <br /> Please note the following Construction Period requirements: <br /> 1. The reinforced concrete and wood framed lateral force resisting system is subject to quality <br /> assurance per IBC Sec. 1705. <br /> 2. Special inspections and testing will be required for; <br /> a. Reinforcing steel <br /> b. Concrete <br /> c. Lateral force resisting systems <br /> d. Structural steel <br /> 3. Testing shall include; <br /> a. Soil bearing capacity(prior to pour) <br /> b. Concrete when specified strength exceeds 2500 psi except slab (ACI) <br /> 4. Special Inspection shali inciude; <br /> a. Reinforcing steel and placement (ACI) <br /> b. Structural steel welds (AWS) and connections <br /> 5. Special Inspection reports shall be provided to the Owner after each inspection and to the City <br /> Inspector upon request. Reports including any observed deficiencies shall be immediately <br /> provided to the Engineer of Record (EOR). <br /> 6. Structural observ�tion by the EOR shall consist of those required by the City or requested by the <br /> Contractor to address construction issues. <br /> 7. Structural observation reports shall be provided to the Owner after each inspection and to the <br /> City Inspector upon request. Reports inciuding any observed deficiencies shall be immediately <br /> provided to the Engineer of Recorcl (EOR). <br /> Please advise if you have any questions or concerns regarding this matter. <br /> Sincerely, <br /> JRR Engineering, Inc. <br /> Gti..'�2' ' � ����j <br /> Ronaid K. Riach, P.E. <br /> \\Kmr\c\I 1RR�I.li7TGRS�0030A1.01 d�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.