Laserfiche WebLink
5•' • <br /> Mikelle Ent. <br /> Attn: Mr. Hendrickson <br /> Plan Check No. CO203-002 <br /> March 7, 2002 <br /> Page 2 of 2 <br /> 9. Provide detail of full height basement wall where Floor joists are parallel to the wall, verify <br /> anchor bolt spacing, and reber replacement. <br /> Prepare a response letter showing where each item in this contiction letter is addressed on the plan set. <br /> Upon resubmittal of the drawings, yow upplication will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient infortnation to ensure that the <br /> proposed strucmre will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> �� . <br /> Jeff Heilman <br /> Development Technician <br /> S:V Lindsay\W'ORU\NEILMAN.1�PIan Chcck NCO203-IXI2.Jac v <br />