Laserfiche WebLink
Roy Burklund Realty <br />Page Two <br />June 13, 1975 <br />Corrective action must be taken to eliminate this drainag� <br />water coming upon our property. Curbs, drainage pipes or <br />catch-basins, or all three remedies, may be necessary to <br />correct this problem. The soil erosion and deposits should <br />be removed from against our building and graded six (6) <br />inches below the bottom of the wood siding. We suggest you <br />will want to reinforce your own bulkhead thus possibly <br />avoiding a cave-in of the corne* of your carport and parking <br />area which in turn, due to the close proximity of cur building, <br />would certainly cause us further damage if not injury. <br />This i� a serious matter, requiring immediate attention. <br />We will look forward to your prompt response. <br />Sincerely, <br />D. L. Snellman <br />President <br />cc: City of Everett ✓/ <br />Building Inspector <br />Bill Kirch <br />DLS/tlh <br />�p �� �.�M ��] <br />JUN 18 1975 <br />CITY OF E�EREjS <br />Inspection Oep� <br />