Laserfiche WebLink
FINAL DECLARATION OF NON -SIGNIFICANCE <br />SEPA # 82-12 <br />12. Drainage calculation will need to be calculated in lieu-0f..providing on -site <br />detention, payment to City Drainage Fund 340 is rew�ercep <br />one). <br />13. Participation in the cost to fund the Northend Sewer required. The <br />approximate cost based on the preliminary information provided is $.0891 per sq. N <br />ft. of retail use and .0162 per sq. ft. of warehouse use. The actual cost shall be � <br />computed by the Building Department per the Ordinance in effect at the time <br />and according to the information provided on the approved plans on the date of <br />permit issuance. <br />14. City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cleaning must occur as directed by the <br />Public Works Inspector. <br />0. A fire hydrant is required within 200 driving feet, but not closer than 50 feet of <br />every structure. <br />16. Future expansion of either the retail or wholesale use onto the second floor must <br />provide parking for the use in compliance with Zoning Code requirements. <br />Proponent: <br />Bryce Koontz <br />11432 41st Dr. N.E. <br />Marysville, WA 98270 <br />Location of Proposal: <br />Southwest corner of California and Grand <br />Lead Agency: City of Everett Planning Department Receipt No. <br />Contact Person: Bob Landles Phone: 259-8731 File No. <br />This proposal has been determined not to have a significant adverse impact on the environment. <br />An Environmental Impact Statement is not required under RCW 43.21C.030(2)(c). This decision <br />was made after review by the lead agency of a completed environmental checklist and other <br />information on file with the lead agency. This Declaration of Non -Significance is specifically <br />conditioned on compliance with the conditions attached hereto which are incorporated by reference <br />as if fully set forth herein. <br />A fifteen day review period has elapsed for this project and no adverse comments were received. <br />Responsible Official: Dennis Derickson <br />Title: Planning Director <br />Date: March 2 , 982 <br />Signature: i0 <br />NOTE: This final Declaration of Non -Significance may be withdrawn in the event of significant <br />changes in this proposal, or failure to comply with the conditions upon which this Declaration <br />of Non -Significance is predicated. <br />