Laserfiche WebLink
t <br />CITY OF EVERETT <br />BUILDING DEPT. <br />3002 WETMORE <br />EVERETT, WASH. 98201 <br />OCT 111983 <br />CITY OF EVERETT <br />Inspection Dept. <br />OMP COMPREHENSIVE BUILDING PLAN - EVERETT PUBLIC MARKET <br />Prepared by: Ralph Rhoads Oct 10, 1983 <br />In the process of developing the Market into a functioning <br />retail mall, a precise plat, is not available. However, the <br />follc•wing guidelines will be followed. <br />BASEMENT Studio's, Service Businesses, Market Offices, <br />Maintenance and Storage. <br />FIRST FLOOR General Retail, Food Services, Retail Foods, <br />Bakery, Produce, Meats, and Bulk Foods. <br />SECOND FLOOR Antique Mall, Arts and Crafts, Collectables, Art <br />Gallery. <br />The floor plan will be constant; however the actual space used <br />by retailers is likely to be modified on a regular basis. The <br />Market's management will at all times maintain a strict and full <br />compliance with all local codes and regulations including <br />Building, Electical, Plumbing, Health and Fire. <br />We are fully aware of the many problems the building presents <br />because of its age and state of repairs. We are also aware of <br />the concerns related to the change of use (from a warehouse to a <br />multiple use retail building). <br />It is our goal to maintain --rtfe and healthy conditions by <br />making physical improvements, enlisting the cooperation of the <br />buildings tenants and cooperating fully with all local regulatory <br />agencies. When requested to make adjustments in the building, <br />they will be done promptly and with dispatch. <br />FIRE The age and wooden construction of the building presents a <br />constant potential of a major fire that could destroy the entire <br />building and endanger the lives of those in the building. <br />We are aware of the letter outlining minimum fire safety <br />requirements. It is our intention to have all the related <br />improvements completed by November 1, 1983. <br />SPRINKLER SYSTEM We have secured the services of Trojan Cc to <br />provide a full inspection and certification of repairs. We are <br />going to train at least 5 persons in the general operation of the <br />system. These 5 will be ones who are regularly in the building. <br />The names of these individuals will be on the file in our office <br />marked FIRE PROTECTION. <br />FIRE EDUCATION PROGRAM At least once a month at the required <br />meetino of all tenants, fire regulations, safety rules, and <br />evacuation procedures will be reviewed. We will invite a <br />